My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alta Management Co. Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(12-06-01) Construction Management for Gateway Park
>
Responses
>
Alta Management Co. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 4:06:10 PM
Creation date
6/14/2012 4:01:35 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction Management Svcs for Gateway Park
Bid No. (xx-xx-xx)
12-06-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Guillermo `Bill' Prado <br />EXPERIENCE <br />2001 to Present ALTA MANAGEMENT, INC. <br />President and Owner <br />• Program and Procurement Management for the Chateau Maplewood Condominium Project in <br />Montreal, Canada. The Project consists of the remodeling of an existing `Historical Structure', built <br />in 1925. The 142 Unit, very high -end Project has a total budget of $180 Million and a LEED Silver <br />rating. <br />• Construction Manager for the Arte City Project in Miami Beach, Florida. Total Project cost of <br />$43 Million. Project consisted of a total of five buildings, a 6 story, 55 unit tower, a 5 story, 57 unit <br />tower and three stand alone two story, "historical" buildings with 28 units, for a total of 140 units. <br />The Project included a one level, `underground basement' parking garage. <br />• Construction Manager for the 40 story, 207 Unit, The CONTINUUM Phase 11 Condominium <br />Project in Miami Beach, Florida. Total Project cost volume was $200 Million. Alta was the <br />Construction Manager for the Tower and also acted as the General Contractor for the foundations <br />of the Tower, the adjacent Pavilion Restaurant, Cabanas and the Main Pool. The Project was <br />successfully completed in March of 2008. <br />• Program & Construction Manager for the 48 story, 386 Unit, AKOYA Condominium Project in <br />Miami Beach, Florida. The Project included an adjacent 6 story parking garage. Total cost was <br />$175 Million. The Project began in December of 2002 and was successfully completed by <br />December of 2004. <br />Construction Manager / Contractor for the Spinnaker Bay Phase 111 residential Project in <br />Boynton Beach, Florida. The Project consisted of 157 high -end single family homes. <br />Construction Manager / Contractor for the high -tech surgical clinic at Premiere Center for <br />Cosmetic Surgery in Weston, Florida. <br />t ?' <br />
The URL can be used to link to this page
Your browser does not support the video tag.