My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-05-01 Landscape Maintenance
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2012 3:46:13 PM
Creation date
6/27/2012 11:42:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Wide Landscaping Services
Bid No. (xx-xx-xx)
12-05-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of SUW P'r <br />City of Sunny Isles Beach I Request for Proposal No. 12 -05 -01 <br />X $ <br />$ <br />B6 <br />One Irrigation Specialist <br />50 Hours <br />(All other times) <br />Per Hour = <br />X $ <br />$ <br />B7 <br />One Irrigation Laborer <br />75 Hours <br />(Sam — 5pm, M -F) <br />Per Hour = <br />X $ <br />$ <br />B8 <br />One Irrigation Laborer <br />50 Hours <br />(All other times) <br />Per Hour = <br />$ <br />B <br />SUBTOTAL <br />NOTE: The quantities shown in this Bid Form are estimates only! They may vary significantly from the actual <br />quantities ordered by the City. Payments shall be for the units ordered, placed, and accepted by the City. The <br />Proposers, by signing this Bid Form and Contract, fully acknowledges that he /she will receive no additional <br />compensation (no overhead, no anticipated profits, etc.) other than the proposal unit price of the items times the <br />number of items authorized, ordered, placed, and accepted by the City. <br />ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PROPOSAL TOTAL <br />C. EQUIPMENT <br />X $ <br />$ <br />C1 <br />One Front End Loader with Backhoe, <br />250 Hours <br />including an Operator <br />Per Hour = <br />X $ <br />$ <br />C2 <br />One Front End Loader with Backhoe, <br />30 Days <br />including an Operator <br />Per Da = <br />X $ <br />$ <br />C3 <br />One Front End Loader with Backhoe, <br />4 Weeks <br />including an Operator <br />Per Week = <br />City of Sunny Isles Beach I Request for Proposal No. 12 -05 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.