Laserfiche WebLink
c/jy OF SUtA Pr` <br />City of Sunny Isles Beach I Request for Proposal No. 12 -05 -01 <br />67A <br />$ P� <br />$ <br />Subtotal Section 'B" Lines No. 194 — 201: <br />C. EQUIPMENT <br />202 <br />C1 <br />One Front End Loader with Backhoe, <br />including an Operator <br />250 Hours <br />$ 60 <br />$ j 510 D0 <br />203 <br />C2 <br />One Front End Loader with Backhoe, <br />including an Operator <br />30 Days <br />$ 4 !b 0 <br />$ 14 i q00 <br />204 <br />C3 <br />One Front End Loader with Backhoe, <br />4 Weeks <br />Qj <br />including an Operator <br />$ of 00 <br />$ % OU <br />205 <br />C4 <br />One Front End Loader with Backhoe, <br />including Operator <br />1 Month <br />$ } 0 4 0o <br />$ I OIL( UO <br />an <br />206 <br />C5 <br />One 15,000 GVW (or larger) Dump <br />Truck with an Operator <br />100 Hours <br />�, <br />$ :3 5 <br />` <br />$ S 0� <br />207 <br />C6 <br />One 15,000 GVW (or larger) Dump <br />10 Days <br />Truck with an Operator <br />$ a 60 <br />$ a 13 0.0 <br />208 <br />C7 <br />One 15,000 GVW (or larger) Dump <br />1 Week <br />Truck with an Operator <br />$ t 4 00 <br />$ i. 0'J <br />209 <br />C8 <br />One 15,000 GVW (or larger) Dump <br />1 Month <br />(00 p.0 <br />Truck with an Operator <br />$6000 <br />$ <br />210 <br />One Trailer Mounted Water Tank (500 <br />C9 <br />gallon minimum) with Pump and Hose <br />20 Days <br />- <br />Reel <br />City of Sunny Isles Beach I Request for Proposal No. 12 -05 -01 <br />67A <br />