Laserfiche WebLink
Pti;9 <br />City of Sunny Isles Beach I Request for Proposal No. 12 -05 -01 <br />$ <br />Subtotal Section "B" Lines No. 194 - 201: <br />C. EQUIPMENT <br />202 <br />C1 <br />One Front End Loader with Backhoe, <br />250 Hours <br />including an Operator <br />$ <br />203 <br />C2 <br />One Front End Loader with Backhoe, <br />30 Days <br />including an Operator <br />$ <br />$ 10e0o <br />204 <br />C3 <br />One Front End Loader with Backhoe, <br />4 Weeks <br />including an Operator <br />$ <br />$ <br />205 <br />C4 <br />One Front End Loader with Backhoe, <br />1 Month <br />including an Operator <br />$ <br />$ <br />206 <br />C5 <br />One 15,000 GVW (or larger) Dump <br />100 Hours <br />Truck with an Operator <br />$ CU <br />$ tot -1 <br />207 <br />C6 <br />One 15,000 GVW (or larger) Dump <br />10 Days <br />Truck with an Operator <br />$ � <br />$ `� �, v <br />`� <br />208 <br />C7 <br />One 15,000 GVW (or larger) Dump <br />1 Week <br />Truck with an Operator <br />$ 1�{C10 <br />$ <br />2,4606) <br />209 <br />C8 <br />One 15,000 GVW (or larger) Dump <br />1 Month <br />Truck with an Operator <br />$ 0.2,0 <br />$ 62 -0V <br />210 <br />One Trailer Mounted Water Tank (500 <br />C9 <br />gallon minimum) with Pump and Hose <br />20 Days <br />$ "ZC� <br />$ <br />Reel <br />City of Sunny Isles Beach I Request for Proposal No. 12 -05 -01 <br />