My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2663
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 3:08:21 PM
Creation date
3/1/2017 3:07:41 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2663
Date (mm/dd/yyyy)
02/16/2017
Description
Agreement #1 w/Ebsary to Construct Ped/Emergency Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Contractor's reasonable control. The City shall schedule the date and time for any inspection <br /> and notify the Contractor and any other parties deemed necessary. During this inspection, the City <br /> and the Contractor shall sign a Substantial Completion Inspection certificate. Any remaining <br /> Work shall be identified on the Punch list form, which work shall be known as Punch List work. <br /> The Punch List shall be signed by the City and the Contractor to confirm that the Punch List <br /> contains the item(s) necessary to complete the Work. The failure or refusal of the Contractor to <br /> sign the Substantial Completion Inspection form or the Punch List, or the failure to include any <br /> items of corrective work on such Punch List, does not alter the responsibility of Contractor to <br /> complete all of the Work in accordance with the Contract Documents. <br /> 11.3 Where the Punch List is limited to minor omissions and defects, the City shall <br /> indicate that the Work is substantially complete subject to completion of the Punch List. Where <br /> the City determines that the Work is not substantially complete, the City shall provide a list of <br /> all open items necessary to achieve Substantial Completion. Upon completion of such Work, <br /> the Contractor shall request another Substantial Completion inspection. <br /> 11.4 The Contractor shall be required to complete all remaining Work included in the Punch List <br /> no later than thirty (30) calendar days from the City's issuance of the Punch List. <br /> 11.5 Upon the receipt of all documentation, resolution of any outstanding issues and <br /> completion of the Punch List items, the City will issue a Final Certificate for Payment. Upon <br /> issuance of the final payment, the City will notify the Contractor in writing of the closeout of the <br /> Project. <br /> 11.6 Warranties required by the Contract Documents shall commence on the date of <br /> Substantial Completion of the Work or designated portion thereof unless otherwise provided in <br /> the Certificate of Substantial Completion. <br /> ARTICLE 12. WARRANTY OF CONSTRUCTION <br /> The Contractor shall warrant that the Work conforms to the Agreement and is free of any patent <br /> and/or latent defect of the workmanship for a minimum period of one year from the date of Final <br /> Completion in addition to all applicable manufacturer warranties. This warranty shall be in <br /> addition to whatever rights the City may have under applicable law. The Contractor's obligation <br /> under this warranty shall be at its own cost and expense, to promptly repair or replace <br /> (including cost of removal and installation), that item (or part or component thereof) which <br /> proves defective or fails to comply with the Agreement within the warranty period such that it <br /> complies with the Agreement. <br /> ARTICLE 13. CONFORMANCE TO DRAWINGS <br /> During the Work, Contractor shall conform in all aspects with any Drawings and furnish such <br /> information as is required to correctly and accurately reflect any changes and/or deviations made <br /> by Contractor during construction to reflect the Work as it was actually constructed. <br /> S B <br /> C6154-1617-036-EBSARY FOUNDATION CO. 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.