Work as used herein refers to all services required by the Contract Documents, including all
<br /> labor, materials, equipment, supervision and services consisting of all labor, materials,
<br /> equipment, tools, manpower, management, supervision, and all other necessary goods and
<br /> services in connection with the following described services for the North Bay Road Pedestrian
<br /> Emergency Bridge: mobilization, MOT, demolition, drilled shafts, cast in place concrete, precast
<br /> concrete structure, administration, contingency, and associated fees.
<br /> ARTICLE 2. SCOPE OF WORK
<br /> Contractor shall provide all labor, materials, equipment, tools, manpower, management,
<br /> supervision, and all other necessary goods and services to perform the following described Work
<br /> in connection with the North Bay Road Pedestrian Emergency Bridge: mobilization, MOT,
<br /> demolition, drilled shafts, cast in place concrete, precast concrete structure, administration,
<br /> contingency, and associated fees.
<br /> Contractor shall provide quantifiable, measurable and verifiable units of deliverables in connection
<br /> with all Work performed under this Agreement. Contractor agrees to perform the Work in
<br /> accordance with all applicable federal, state and local statutes, rules and regulations, including but
<br /> not limited to the approved construction documents and all standards and specifications of the
<br /> City.
<br /> ARTICLE 3. CONTRACT TIME, TIME FOR COMPLETION AND LIQUIDATED
<br /> DAMAGES
<br /> 3.1 The Commencement Date shall be no later than five (5) days after City's issuance of the
<br /> Notice to Proceed. Contractor shall perform the Work in accordance with the Contract Documents
<br /> and shall achieve Substantial Completion of the Project no later than 395 (Three Hundred and
<br /> Ninety Five) calendar days from the issuance of the Notice to Proceed ("Substantial
<br /> Completion"). Thereafter, Contractor shall be required to obtain Final Completion of the Project
<br /> no later than 60 (Sixty) calendar days from the date of the City's Punch List to Contractor("Final
<br /> Completion").
<br /> 3.2 Contractor shall complete all applications for the Permits, and submit all required
<br /> documents, including but not limited to the Bonds and the Insurance Certificate, within ten (10)
<br /> calendar days after issuance of a Notice to Proceed by the City. In the event Contractor fails to
<br /> deliver to the City the required documents within ten (10) days after issuance of a Notice to
<br /> Proceed, or fails to apply for the Permits within ten (10) days after issuance of a Notice to
<br /> Proceed, or fails to commence the Work within five (5) days after issuance of a Notice to
<br /> Proceed, then Contractor shall be in default. In such event the City, in addition to all remedies
<br /> provided for an event of Contractor's default hereunder, shall have the right to collect from
<br /> Contractor all expenses incurred by the City in the re-procurement of the Work in connection with
<br /> RFP 14-09-01.
<br /> 3.3 Upon failure of Contractor to achieve Substantial Completion of the Work by the Time for
<br /> Completion, plus approved time extensions (if applicable), Contractor shall pay to the City the
<br /> sum of Three Thousand Seven Hundred Seventy Dollars ($3,770.00) for each calendar day
<br /> after the Time for Completion plus any approved time extensions (if applicable), as set forth
<br /> in Section 2.20 of RFP 14-09-01. After Substantial Completion, if Contractor fails to fully