My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2667
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2667
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2017 7:16:17 PM
Creation date
3/1/2017 3:16:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2667
Date (mm/dd/yyyy)
02/16/2017
Description
COs 1-6 w/Rohl Networks for Util. Underground/Collins Ave & Atlantic Blvd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
all of the antiquated aluminum and wood pole mounted "cobra head" <br /> street lighting with decorative fixtures currently in use in limited areas <br /> along Collins Avenue. The fixtures will include outlets for future <br /> decorations, as well as decorative brackets for holding banners. The <br /> project was originally intended to follow the FDOT Resurfacing, <br /> Restoration and Rehabilitation ("RRR") pavement project and the final <br /> phase of the Utility Undergrounding on Collins. City staff has been able <br /> to determine the feasibility of moving ahead with eighty percent (80%) <br /> of the project immediately preceding the FDOT project with the final <br /> twenty percent (20%) remaining upon completion of the overhead wiring <br /> removal. Purchasing all of the material for the project at this time and <br /> storing until installation is available will result in further overall project <br /> cost savings.A portion of this project will be funded by FDOT through a <br /> Departmental Funding Agreement (DFA)with the City. Due to the timing <br /> restrictions of the "RRR", proceeding prior to the finalization of the DFA <br /> is recommended. The total amount of this additional work is <br /> $1,553,200. <br /> ATTACHMENTS: <br /> Description <br /> Resolution <br /> Change Order Nos. 1-6 <br /> Item Number: 10.K. <br /> 365 <br />
The URL can be used to link to this page
Your browser does not support the video tag.