My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cool-Breeze Air Conditioning Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(16-12-02) HVAC Chiller Systems for Pelican Community Park
>
Responses
>
Cool-Breeze Air Conditioning Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:42:45 PM
Creation date
3/7/2017 3:42:41 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
HVAC Chiller Systems for Pelican Community Park
Bid No. (xx-xx-xx)
16-12-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. <br /> CITY OF SUNNY ISLES BEACH • <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, Florid°33160 <F,.� <br /> -s 305:947.0606 - <br /> • <br /> www.sibfl.net • •- <br /> ' t <br /> „ft)'SIS-t4 <br /> BID FORM 2 <br /> Reference Questionnaire <br /> To Whom It May Concern <br /> Subject: Reference Letter for Bid No. 16-12-02 for New HVAC Chiller Systems <br /> for Pelican Community Park <br /> Name of Bidder/Proposer: Cool-Breeze Air Conditioning corp. <br /> The above referenced Contractor is submitting a bid for a solicitation that has been issued by the City of <br /> Sunny Isles Beach.We require that the Contractor provide written references with their submission. By <br /> providing you with this document the Contractor is requesting that you provide the following reference <br /> information. We would appreciate you providing the information requested below as well as any other <br /> information your feel is pertinent. <br /> Title of Contract: Galleria Professional Building <br /> Scope of work: Replace 10 Ton air conditioning unitfReplace a 150 Ton cooing tower <br /> Value of Contract$12,000.00/580,000.00 <br /> Was the work performed timely?Les No <br /> Was the work performed timely&to acceptable quality standards? ',Ye_ No <br /> V <br /> Have there been any repairs required under the warranty? a; No <br /> Would you enter into a contract with the Contractor in the future? No <br /> If no to any of the above, please provide details: <br /> Yes to all the above <br /> Comments: <br /> I have been using Cool-Breeze Air Conditioning Corp since 2002 and have not had a problem with their ability to preform the necessary tasks <br /> in a timely fashion.they are always quick to resolve any issues that arrive concerning my air conditioning equipment and <br /> cooling towers. <br /> Thank you for your assistance in helping us in evaluating our bid solicitation. <br /> Name of individual completing this form:Lucille Haynes <br /> Agency:Galleria Professional Building Title:Building Administrator <br /> Telephone:9�-566-7497 /�/ E-mail: lucy@galleriaprofessionalbuilding.com <br /> C <br /> Signature: ' t Date: February 21,2017 <br /> Sincerely, <br /> Genesis Cuevas <br /> Purchasing Agent <br /> City of Sunny Isles Beach I Invitation to Bid No. 16-12-02 24 ' _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.