My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1942
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 3:10:06 PM
Creation date
8/28/2012 11:14:17 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1942
Date (mm/dd/yyyy)
07/19/2012
Description
Change Order #6 to Agmt w/Shoreline Foundation for Fishing Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c,r� of su!+ Ha <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947 -0606 City Hall <br />(305) 949 -3113 Fax <br />MEMORANDUM <br />TO: The Honorable Mayor and City Commission <br />FROM: Chief Fred A. Mass, Acting City Manager <br />DATE: 7/19/2012 <br />RE: Shoreline Foundation, Inc Construction Change Order #6 for the <br />Newport Pier Project <br />RECOMMENDATION: <br />It is recommended that the attached Resolution be approved. <br />REASONS: <br />The original contract plans for the approach slab to the restaurant building called for six <br />(6) 24 "x24" precast piles at a price of $43,795.64 to be driven via diesel hammer ane <br />would require temporary encroachment onto LaPerla property. This would have the <br />potential for cracking /spalling of the deck/structure due to vibration. The revised plar <br />relocates the piles, reduces their size and utilizes in installation methodology whicl• <br />reduces vibrations, and due to the smaller size of these piles, the number of piles requires <br />to support the structure is increased from six (6) to eight (8).The change order fol <br />installing eight (8) 18" round auger cast piles was not considered in the original contract <br />and is resulting in Change Order No. 6 increasing the Agreement in an amount not tc <br />exceed $13,298.46. <br />Please note that this Change Order increases the contract time by fifteen (15) days. A report <br />prepared by Calvin Giordano is attached. <br />FUNDING SOURCE: <br />Funding is available in account number 20- 600 -5670. <br />ATTACHMENTS: <br />Resolution <br />Change Order No. 6 <br />Agenda Item No. IOL\nDate 7/19/2012 <br />187 <br />
The URL can be used to link to this page
Your browser does not support the video tag.