Laserfiche WebLink
Project: Newport Fishing Pier- Augarcast Piles <br />Owner Contract No. <br />Owner: <br />Data: Jane 14, .2012 MUM rm <br />Location: Augercast Piles for Restaurant <br />Building, <br />SFI Contract No. M10 -443 (Exhibit -A) <br />Contractor; Shoreline Foundation, Inc. <br />2781 SW 56 Ave <br />Pembroke Park, Florida 33023 <br />(REVISED) WORK 11 0131FICATION REQUEST <br />Description Type <br />Unit of <br />Maas. <br />units <br />Unit Cost <br />Labor <br />Equipment <br />Matorial <br />Moir <br />Description of additional work, SUMMARY '(REVISED WORMATION) <br />Equipment Cost <br />E <br />us <br />1 <br />$21.02.90 <br />21,502.96 <br />Mobilization Cost <br />H <br />us <br />1 <br />$10,000100 <br />$10,000,00 <br />Material Cost <br />M <br />US <br />1 <br />$12,631.70 <br />$12,531.79 <br />Augorcast Labor Cost <br />L <br />US <br />1 <br />$12,099.35 <br />$12,999.3b <br />*3rd PartyEnglneering <br />( Inspections /Pile Log Etc.) <br />5 <br />TOD <br />TBD <br />TBD <br />TBD <br />TBD <br />T13D <br />Subtotal <br />$12,999,35 <br />$21.662.90 <br />$12,531:79 <br />$10,000,00 <br />Subtotal <br />$57,094.10 <br />$0.00 <br />Total <br />$67,094.10 <br />