My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1949
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 3:19:34 PM
Creation date
8/28/2012 11:21:38 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1949
Date (mm/dd/yyyy)
07/19/2012
Description
Consult Agmt w/Hari Cruz-Bustillo Construction Mgmt Srv for Gateway Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Management I Services I Hazen and Sawyer Page 2 of 4 <br />The [[Conner Creek CSO facility]], capable of treating up to <br />two billion gallons per year of peak sewer overflow, was <br />online four months ahead of schedule and within the original <br />budget. <br />During expansion of the [[Paerdegat Basin CSO Control Facility]], we <br />oversaw construction of the deepest cutoff slurry wall in the area - 200 - <br />feet deep and 1,900 -feet long - in a densely populated area with a <br />groundwater table only 10 to 15 feet below grade. <br />Hazen and Sawyer was chosen by the Town of Culpeper, Virginia to <br />provide design, construction management and process optimization <br />- services for the 6 -mgd Culpeper Wastewater Treatment Plant. The project <br />integrates 5 stage BNR using cost effective above ground circular tanks, to <br />ensure compliance with stringent effluent limits for nitrogen and phosphorous. <br />Enhanced nutrient removal facilities under construction at the City of <br />Waynesboro, Virginia's treatment facility include deep bed denitrification <br />filters, UV disinfection, above grade 5 -stage BNR, screening and grit <br />removal and solids processing. Hazen and Sawyer partnered with a local <br />firm and together have provided complete design and construction phase services. <br />To provide safe drinking water to the urban service areas of La Romana, <br />N� San Cristobal, and San Francisco de Macoris, the National Institute of <br />Water and Sewage of the Dominican Republic (INAPA) retained the <br />Biwater /Sinercon Consortium for the Design -Build delivery of [[three 23- <br />MGD Water Treatment Plants]] and associated infrastructure. In turn, Biwater U.S.A. <br />retained Hazen and Sawyer to provide engineering design and construction <br />management services for the project. <br />For Detroit Water and Sewerage Department's 240 -mgd Water Works Park <br />Facility we provided construction phase services as Owner's <br />hit Representative for this design -build project, including oversight of design <br />and construction, and the creation of training and O &M manuals. <br />Following completion of planning and design, we performed construction <br />administration and inspection services for expansion of the [[Neuse River <br />WWTP]] to 60 mgd, including nine construction contracts encompassing <br />improvements to various treatment processes, emergency power <br />generation, and tertiary filter retrofits for nitrogen removal. <br />In Leesburg, VA, we prepared a siting study, and subsequently provided <br />design and construction administration services for two 3 -mg elevated <br />water storage tanks. One of the tanks housed a booster pumping station <br />http: / /www.hazenandsawyer.com/ work /services /construction -ma... 7/11/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.