My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Iron Sky
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-09-01 Automated License Plate Recognition
>
Responses
>
Iron Sky
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2012 12:09:38 PM
Creation date
10/4/2012 12:06:04 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Automated License Plate Recognition
Bid No. (xx-xx-xx)
12-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• CASE STUDY > <br /> City of College Park,GA <br /> 1111 41111111111 li <br /> . I;'. I.., <br /> il <br /> Sample footage from an Iron Sky camera <br /> a single web page.Rather than present of the project to a minimum,the city complete their specific ask on schedule <br /> users with an overwhelming number used its power company to perform and on budget. <br /> of tabs,navigation trees,shortcut keys the physical installation of cameras <br /> and web pages,users simply select the and wireless equipment.Managing this RESULTS <br /> desired camera from its position on project required diligent coordination by T he cameras have equipped <br /> Google Maps and utilize all functionality Iron Sky's project management staff as the police department with <br /> without ever having to navigate away well as the police department and the an incredibly effective tool to <br /> from the page. College Park Power Company. fight crime.Within the first 12 hours <br /> Iron Sky believes that the one of the Iron Sky has a robust delivery of its use,officers made three arrests <br /> most important function of its VMS is to methodology that allowed it to manage in high-traffic areas monitored by Iron <br /> deliver images to critical personnel when the entire process in a very short Sky cameras.Footage also serves as a <br /> • and where they are needed in response amount of time,eliminating issues that performance management tool for the <br /> to an incidentThe Iron Sky VMS is a thin- typically arise when multiple parties department as they work to allocate <br /> client application that enables the city are involved in a single installation. resources strategically. <br /> of College Park to grant access to the Iron Sky began the project with a pre- "This system gives us high-definition <br /> cameras to a new user,regardless of what construction kickoff meeting with all video footage that makes it easier <br /> department or agency they are with, relevant parties to identify points of for officers to get the job done,"said <br /> simply by giving them an IP address,user contact,assign department-specific College Park police chief Ron Fears. <br /> name and password. responsibilities,agree to delivery dates Georgia's"Global City"will soon have <br /> The key to success on the and ensure that everyone understood 33 surveillance cameras currently in use, <br /> wireless portion of this project was the scope of work and city officials plan future expansion <br /> the elimination of"hop"loss on self- Project managers met regularly of the Iron Sky system to the Georgia <br /> healing mesh units deployed by Iron with key stakeholders from the police International Convention Center and the <br /> Sky.Even with the high resolution of the department,city council and local Godby Road Recreation Center. <br /> megapixel cameras,Iron Sky was able to businesses to keep them apprised Officers are excited about the new <br /> deploy wireless equipment that could of the project's progress.Iron Sky's technology and its ease of use,facilitated <br /> flawlessly handle the large video files project management staff also gathered by two simple clicks of the mouse to <br /> being transmitted—even when passing information from the client necessary gain detailed video footage. <br /> through multiple wireless radios.Each of for the staging and configuration of <br /> the wireless radios is capable of 56 Mbps the equipment and provided training <br /> and utilizes three different frequency and installation manuals to the <br /> CONTACT IRON SKY <br /> ranges(2.4GHz,4.9 GHz and 5.8 GHz) relevant installation crews prior to the Bob Carter,General Manager <br /> for flexibility in design and maximum equipment being delivered.The high 678-283-4829 <br /> uninterrupted bandwidth. level of coordination was necessary bcarter@lronSky.com <br /> To keep the total cost of ownership to provide everyone with the tools to ironsky.com <br /> Better tools to fight crime, <br /> • <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.