My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1964
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 3:31:06 PM
Creation date
10/11/2012 4:31:31 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1964
Date (mm/dd/yyyy)
09/20/2012
Description
Ratify Agmt w/Calvin Giordano:Construction Project Mgr/Bella Vista Pk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Authorization No. <br />July 23, 2012 <br />Calvin, Giordano & Associates, Inc. Proposal No. 12 -5204 <br />CITY OF SUNNY ISLES BEACH <br />Construction Project Management <br />PROJECT DESCRIPTION <br />1. SCOPE OF SERVICES <br />Calvin, Giordano & Associates, Inc. will perform the following services based on <br />our understanding of the project requirements: <br />I. Professional Construction Services <br />A. Permitting and Project Setup: CGA Project Manager shall coordinate the <br />project Design Team efforts necessary to obtain all required outstanding <br />permits. Note: Coordination dependent upon retention, by the City, of the <br />Design Team to include the Architect, MEP & Structural Engineers, Civil <br />Engineer & Surveyor. PM shall review CONTRACTOR's remobilization <br />requirements as related to approvals, material and equipment availability, <br />subcontractor issues and CONTRACTOR's additional costs. <br />B. General Coordination: CGA PM shall communicate periodically with the <br />CITY and the CONTRACTOR as needed. He shall report on concerns as it <br />relates to the construction efforts and activities and provide at a minimum <br />bi- weekly written updates/reports. <br />C. Meetings: CGA PM shall be expected to chair and participate in Pre - <br />Construction and periodic Progress Meetings with the CITY, <br />CONTRACTOR and DESIGN TEAM and provide meeting minutes. <br />D. Shop Drawing Submittals: CGA PM shall process shop drawing and <br />product approvals throughout the duration of the construction period. Note: <br />Design Team required to review and approve Submittals. <br />E. Request for Information / Contract Document Clarification: When RFI's <br />and CDC's involve design issues interpretations, the CGA PM shall <br />coordinate with the CITY and the CITY's DESIGN TEAM as needed, to <br />resolve the CONTRACTORs RFI's, CDC's, Field Order's and other related <br />correspondence. The CGA PM shall also verify for the CITY that the <br />DESIGN TEAM is providing a written response to RFI's and CDC's in a <br />timely manner and that they are processing, logging and distributing all <br />RFI's/CDC's. <br />
The URL can be used to link to this page
Your browser does not support the video tag.