My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1965
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 3:31:52 PM
Creation date
10/11/2012 4:34:05 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1965
Date (mm/dd/yyyy)
09/20/2012
Description
Ratify Agmt w/Calvin, Giordano: Survey Srvs of Wm Lehman Causeway
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preview <br />c�Tr Dr 6VA ��y0 <br />TO: <br />FROM: <br />DATE: <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947 -0606 City Hall <br />(305) 949 -3113 Fax <br />MEMORANDUM <br />The Honorable Mayor and City Commission <br />Helen Gray, PE, City Engineer <br />9/20/2012 <br />Page 1 of 1 <br />RE: A Resolution Ratifying an Agreement with Calvin, Giordano and <br />Associates to Provide Professional Survey Services for a Route <br />Survey of the William Lehman Causeway <br />RECOMMENDATION: <br />It is recommended that City Commission ratify the Agreement with Calvin, Giordano <br />and Associates. <br />REASONS: <br />In developing the FY 2012/2013 budget, a Capital Project is included to replace the <br />existing chain link fence running between the Lehman Causeway and Oceanview /Ocean <br />Reserve properties to the north. In order to properly design and obtain plan <br />approvals /permits for the future solid wall, a route survey is needed. This future wall will <br />generally match the height, color, and overall character of the existing wall on the south <br />side of the Lehman Causeway. In addition, this scope of work includes setting a <br />benchmark in the project area for use in the construction of the new wall as well as for <br />setting the proposed modular unit(s) for the Public Works Compound to an appropriate <br />finish floor elevation. In an amount not to exceed $5,027.50 <br />ATTACHMENTS: <br />• Resolution <br />• Map <br />http: / /sibagenda. sibfl. netlagendalPreview.aspx ?ItemID = 865 &MeetingID= O &MeetingDate... 9/13/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.