My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2012-1982
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2012
>
Reso 2012-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2013 2:36:28 PM
Creation date
10/25/2012 4:10:34 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2012-1982
Date (mm/dd/yyyy)
10/18/2012
Description
CGA 1st Amend to Agmt Emergency Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Authorization No.145 <br /> October 12,2012 <br /> Calvin,Giordano&Associates,Inc.Proposal No.12-5064 <br /> • <br /> CITY OF SUNNY ISLES BEACH <br /> North Bay.Road Bridge Scope Increase <br /> PROJECT DESCRIPTION <br /> 1. SCOPE OF SERVICES - <br /> Calvin, Giordano & Associates, Inc. will perform the following services based on <br /> our understanding of the project requirements: <br /> I. Professional Government Consulting Services <br /> A. Coordinate 90% drawings through a complete, detailed construction take <br /> off and cost estimate. This process was excludedifroin the original.work <br /> authorization by the then City Manager. In recent meetings we have <br /> discussed the potential cost saving that could be obtained via this process by <br /> providing the plans to a well-known, licensed Marine Contractor. The <br /> process will include constructability review, Value Engineering Review and <br /> RFI/potential Change Order identification. The process of flushing out any <br /> RFI or Change Orders prior to the plans being put out to bid can result in a <br /> significant cost savings to the Owner. <br /> B. Coordinate revisions to drawings and constructability issues such easements <br /> and access that are generated from the detailed review by the licensed <br /> Contractor. <br /> C. Complete final review of 100% drawings to ensure all revisions were <br /> completed and no unintended consequences resulted from the plan revisions. <br /> 2. BASIS OF COMPENSATION <br /> Hourly rates with an estimated fee of$9,195.00 plus reimbursables at $459.75 with <br /> a total not to exceed amount of$9,654.75. Payments to be made monthly. <br /> 3. SUBMITTED -e � <br /> • <br /> Submitted by. � Date: CV Q J �/ _ .• <br /> CA•CVIN,GIORDANO&ASSOCIATES, INC. <br /> 4. APPROVAL <br /> Approved by Date: <br /> Alan Cohen, City Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.