My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner, the City shall review and either accept or reject the <br /> Surety Company based on the financial information available to the <br /> City. A Surety Company that is rejected by the City may be <br /> substituted by the bidder or proposer with a surety company <br /> acceptable to the City, only if the bid amount does not increase. <br /> a. The Surety Company shall have at least the following <br /> minimum ratings: <br /> Amount of Bond Policyholder's Rating Financial Size <br /> Category <br /> 100,000 to 1,000,000 B++ Class V or higher <br /> 1,000,001 to 2,000,000 A- Class VI or higher <br /> 2,000,001 to 5,000,000 A Class VII or higher <br /> b. All Surety Companies are subject to review and approval by <br /> the Owner and may be rejected without cause. All bonds <br /> signed by an Agency must be accompanied by a certificate <br /> of authority to act. <br /> 15.5 The Surety Company shall submit verification from the Department of <br /> Insurance Office of the Treasurer stating the surety company's license and <br /> certificate of authorization to do business in the State of Florida. <br /> 16. SUBCONTRACTOR LIST <br /> 16.1 In conjunction with the Bid Form, Bidder shall submit a list of names of the <br /> subcontractors and major material suppliers proposed for the principal <br /> portions of the Work. Submit list on form provided by the Engineer. <br /> 16.2 Prior to award of Contract, the Owner will notify the Bidder in writing if they <br /> have an objection to any person or entity listed. Upon such reasonable <br /> objection, the Bidder shall propose an acceptable substitute person or <br /> entity in accordance with Article 6.06 of the General Conditions. <br /> 17. BID PROTEST <br /> 17.1 In the event of a timely protest, the City Manager or his/her designee shall <br /> stay the award of the contract unless, after consulting with the City <br /> Attorney and the affected director, he/she determines that the award of the <br /> contract without delay is necessary to protect substantial interests of the <br /> Owner. <br /> 17.2 The City shall require a deposit from a protester to compensate the Owner <br /> for the expenses of administering the protest. If the protest is decided in <br /> the protester's favor, the entire deposit shall be returned to the protester. If <br /> the protest is not decided in the protester's favor, the deposit shall be <br /> forfeited to the Owner. The deposit shall be in the form of a cashier's <br /> check and shall be in the amount of 3% (three percent) of the amount of <br /> 08/12 00100-7 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.