My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Excavation for Trenches: Dig trenches to the uniform width required for <br /> particular item to be installed, sufficiently wide to provide ample working room. <br /> Provide minimum 6 in. clearance on each side of pipe or conduit. <br /> 1. Excavate trenches to depth indicated or required for indicated flow lines <br /> and invert elevations. <br /> 2. Where rock is encountered, carry excavation 6 in. below scheduled <br /> elevation and backfill with a 6 in. layer of crushed stone or gravel prior to <br /> installation of pipe. <br /> 3. For pipes or conduit 5 in. or less, excavate to indicated depths. Hand <br /> excavate bottom cut to accurate elevations and support pipe or conduit <br /> on undisturbed soil. <br /> 4. For pipes or conduit 6 in. or larger, tanks and other work indicated to <br /> receive subbase, excavate to subbase depth indicated, or, if not <br /> otherwise indicated, to 6 in. below bottom of work to be supported. <br /> 5. Except as otherwise indicated, excavate for exterior water-bearing piping <br /> so top of piping is minimum 3'-0" below finished grade. <br /> 6. Grade bottoms of trenches as indicated, notching under pipe bells to <br /> provide solid bearing for entire body of pipe. <br /> Do not backfill trenches until tests and inspections have been made and <br /> backfilling authorized by Engineer. <br /> 3.02 COMPACTION <br /> A. Areas to be compacted shall be moistened and compacted by either rolling, <br /> tamping or any other approved method by the Engineer in order to obtain the <br /> desired density. The Contractor shall inspect all compacted areas prior to further <br /> construction operations to ensure that satisfactory compaction has been <br /> obtained. All backfill adjacent to structures and pipes, shall be compacted to a <br /> density of not less than 100 percent of the maximum density as determined by <br /> AASHTO T-99. Density tests are required, such tests shall be made as directed <br /> by the Engineer at the expense of the Contractor. The Contractor shall instruct <br /> the testing laboratory to forward copies of all test reports to the Engineer. <br /> B. Remove and replace, or scarify and air dry, soil material that is too wet to permit <br /> compaction to specified density. <br /> 3.03 BACKFILL AND FILL <br /> A. Place specified soil material in layers to required subgrade elevations: <br /> 1. In excavations, use satisfactory excavated or borrow material. <br /> 2. Under grassed areas, use satisfactory excavated or borrow material. <br /> 3. Under walks and pavements, use subbase material, or satisfactory <br /> excavated or borrow material, or combination of both. Place shoulders <br /> along edges of subbase course to prevent lateral movement with <br /> satisfactory excavated or borrow material. <br /> 4. Under steps, use subbase material. <br /> 5. Under building slabs, use drainage fill material. <br /> 08/12 02200-3 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.