My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.05 FIELD QUALITY CONTROL <br /> A. Contractor will engage soil testing and inspection service for quality control <br /> testing during earthwork operations. <br /> B. Allow testing service to inspect and approve subgrades and fill layers before <br /> further construction work is performed. <br /> C. If in opinion of Engineer, based on testing service reports and inspection, <br /> subgrade or fills which have been placed below specified density, provide <br /> additional compaction and testing at no additional expense to Owner. <br /> 3.06 CLEANING AND PROTECTION <br /> A. Protect newly graded areas from traffic and erosion. Keep free of trash and <br /> debris. <br /> B. Repair and re-establish grades in settled, eroded, and rutted areas to specified <br /> tolerances. <br /> C. Remove excess excavated and waste materials, including unacceptable <br /> excavated material, trash and debris, and legally dispose of it off Owner's <br /> property. <br /> END OF SECTION <br /> 08/12 02200-5 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.