Laserfiche WebLink
4. The line and grade of all piping, as well as the location of all <br /> appurtenances, will be shown on the drawings, or as directed by the <br /> Engineer. <br /> 5. The Contractor shall give the Engineer and the City a minimum of forty- <br /> eight hours notice for any engineering or inspection necessary to continue <br /> or complete the work. <br /> B. Excavation, Bedding, and Backfill: <br /> Excavation, bedding and backfill shall conform to Section 02221 of these <br /> specifications. <br /> 3.03 TESTS <br /> A. The system shall be pressure tested. . <br /> END OF SECTION <br /> 08/12 02610-5 11-4179 <br />