My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER shall determine, only after receipt of the final as-builts and upon substantial <br /> completion of the project and in accordance with Paragraph 14.02 of the General <br /> Conditions. <br /> 5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with <br /> paragraph 14.07 of the General Conditions, OWNER shall pay the remainder of the Contract Price <br /> as recommended by ENGINEER as provided in said paragraph 14.07. <br /> Article 6. INTEREST. (Not Applicable) <br /> Article 7. CONTRACTOR'S REPRESENTATIONS. <br /> In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following <br /> representations: <br /> 7.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the <br /> Addenda listed in paragraph 8) and the other related data identified in the Bidding Documents <br /> including "technical data." <br /> 7.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, <br /> local and site conditions that may affect cost, progress, performance or furnishing of the Work. <br /> 7.3. CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and <br /> Regulations that may affect cost, progress, performance and furnishing of the Work. <br /> 7.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface <br /> conditions at or contiguous to the site and all drawings of physical conditions in or relating to <br /> existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) <br /> which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1. of the <br /> General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC-4.2 of <br /> the Supplementary Conditions of the extend of the "technical data" contained in such reports and <br /> drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.2 of the General <br /> Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract <br /> Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR <br /> acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy or <br /> completeness of information and data shown or indicated in the Contract Documents with respect to <br /> Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully <br /> studied (or assumes responsibility for having done so) all such additional supplementary <br /> examinations, investigations, explorations, tests, studies and data concerning conditions (surface, <br /> subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect <br /> cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, <br /> methods, techniques, sequences and procedures of construction to be employed by <br /> CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not <br /> consider that any additional examinations, investigations, explorations, tests, studies or data are <br /> necessary for the performance and furnishing of the Work at the contract Price, within the Contract <br /> Times and in accordance with the other terms and conditions of the Contract Documents. <br /> 7.5. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others <br /> at the site that relates to the Work as indicated in the Contract Documents. <br /> 7.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br /> observations obtained from visits to the site, reports and drawings identified in the Contract <br /> Documents and all additional examinations, investigations, explorations, tests, studies and data <br /> with the Contract Documents. <br /> 7.7. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or <br /> discrepancies that CONTRACTOR has discovered in the Contract Documents and the written <br /> resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract Documents <br /> 08/12 00500-3 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.