My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
specifically stated to the contrary in any written consent to an assignment no assignment <br /> will release or discharge the assignor from any duty or responsibility under the Contract <br /> Documents. <br /> 9.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and <br /> legal representatives to the other party hereto, its partners, successors, assigns and legal <br /> representatives in respect to all covenants, agreements and obligations contained in the <br /> Contract Documents. <br /> 9.4. Any provisions or part of the Contract Documents held to be void or unenforceable under <br /> any Law or Regulation shall be deemed stricken, and all remaining provisions shall <br /> continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the <br /> Contract Documents shall be reformed to replace such stricken provisions or part thereof <br /> with a valid and enforceable provision that comes as close as possible to expressing the <br /> intention of the stricken provision. <br /> 9.5. OTHER PROVISIONS. <br /> 9.5.1. DRAWINGS <br /> See Index Sheet on Drawings <br /> 9.5.2. In accordance with the indemnification provision contained in the General Conditions, the <br /> CONTRACTOR agrees to indemnify and save harmless the CITY OF SUNNY ISLES BEACH, and <br /> their agents and employees, from or on account of any injuries or damages received or sustained <br /> by any person or person during or on account of any operations connected with the construction of <br /> all Work; or by or in consequence of any negligence in connection with the same; or by use of any <br /> improper materials or by or on account of any act or omission of the said Contractor, subcontractor, <br /> agents, servants, or employees; and <br /> 9.5.3. The CONTRACTOR agrees to maintain in force at all times during the life of the <br /> construction, public liability insurance, by separate certificate, in an amount not less than $1,000,000 <br /> for injuries, including willful death, to any one person and subject to those same limits for each <br /> person, in an amount not less that $1,000,000 for damages as a result of each occurrence and <br /> property damage insurance and in an amount not less than $1,000,000 for damages on any one <br /> occurrence. Such policy shall specifically protect the CITY OF SUNNY ISLES BEACH, AND their <br /> agents and employees, by making them an additional insured, and shall not be modified or <br /> canceled without thirty (30) days written notice to the CITY OF SUNNY ISLES BEACH. <br /> 9.5.4 Should the final completion and acceptance of the work herein embraced together with <br /> any modification or additions be delayed beyond the time herein set because of lace of performance <br /> by the Contract, it is understood and agreed that aside from any other liquidated damage per day for <br /> such delay from such time until the work is completed and accepted as herein provided, all costs of <br /> engineering and inspection on behalf of the Owner will be charged to the contractor and deducted <br /> from any estimate or payment otherwise due and payable to him from time to time. The costs of <br /> engineering and inspection which may be charged to the Contractor by the Owner under this article <br /> shall be equal to the Engineer's charges to the Owner. <br /> IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in Five (5) parts. <br /> One counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions of <br /> the Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR or <br /> identified by ENGINEER on their behalf. <br /> 08/12 00500-5 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.