My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
contrary to the provisions of Paragraph 9.09 or any meaning are used in the Contract Documents in <br /> other provision of the Contract Documents. accordance with such recognized meaning. <br /> C. Day <br /> ARTICLE 2 - PRELIMINARY MATTERS <br /> 1. The word "day" means a calendar <br /> day of 24 hours measured from midnight to the next <br /> midnight. 2.01 Delivery of Bonds and Evidence of <br /> Insurance <br /> D. Defective <br /> A. When Contractor delivers the executed <br /> 1. The word "defective," when modifying the counterparts of the Agreement to Owner, Contractor <br /> word "Work," refers to Work that is unsatisfactory, shall also deliver to Owner such bonds as <br /> faulty, or deficient in that it: Contractor may be required to furnish. <br /> a. does not conform to the Contract B. Evidence of Insurance: Before any Work <br /> Documents, or at the Site is started, Contractor and Owner shall <br /> each deliver to the other, with copies to each <br /> b. does not meet the requirements of any additional insured identified in the Supplementary <br /> applicable inspection, reference standard, Conditions, certificates of insurance (and other <br /> test, or approval referred to in the Contract evidence of insurance which either of them or any <br /> Documents, or additional insured may reasonably request) which <br /> Contractor and Owner respectively are required to <br /> c. has been damaged prior to Engineer's - purchase and maintain in accordance with Article 5. <br /> recommendation of final payment (unless <br /> responsibility for the protection thereof has 2.02 Copies of Documents <br /> been assumed by Owner at Substantial <br /> Completion in accordance with Paragraph A. Owner shall furnish to Contractor up to <br /> 14.04 or 14.05). ten printed or hard copies of the Drawings and <br /> Project Manual. Additional copies will be furnished <br /> E. Furnish, Install, Perform, Provide upon request at the cost of reproduction. <br /> 1. The word "furnish," when used in connec- 2.03 Commencement of Contract Times; Notice <br /> tion with services, materials, or equipment, shall to Proceed <br /> mean to supply and deliver said services, materials, <br /> or equipment to the Site (or some other specified A. The Contract Times will commence to run <br /> location) ready for use or installation and in usable on the thirtieth day after the Effective Date of the <br /> or operable condition. Agreement or, if a Notice to Proceed is given, on the <br /> day indicated in the Notice to Proceed. A Notice to <br /> 2. The word "install," when used in connec- Proceed may be given at any time within 30 days <br /> tion with services, materials, or equipment, shall after the Effective Date of the Agreement. In no <br /> mean to put into use or place in final position said event will the Contract Times commence to run later <br /> services, materials, or equipment complete and than the sixtieth day after the day of Bid opening or <br /> ready for intended use. the thirtieth day after the Effective Date of the <br /> Agreement, whichever date is earlier. <br /> 3. The words "perform" or "provide," when <br /> used in connection with services, materials, or 2.04 Starting the Work <br /> equipment, shall mean to furnish and install said <br /> services, materials, or equipment complete and A. Contractor shall start to perform the Work <br /> ready for intended use. on the date when the Contract Times commence to <br /> run. No Work shall be done at the Site prior to the <br /> 4. When "furnish," "install," "perform," or date on which the Contract Times commence to run. <br /> "provide' is not used in connection with services, <br /> materials, or equipment in a context clearly requiring 2.05 Before Starting Construction <br /> an obligation of Contractor, "provide" is implied. <br /> A. Preliminary Schedules: Within 10 days <br /> F. Unless stated otherwise in the Contract after the Effective Date of the Agreement (unless <br /> Documents, words or phrases which have a well- otherwise specified in the General Requirements), <br /> known technical or construction industry or trade <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright D 2002 National Society of Professional Engineers for EJCDC. All rights resen'ed. <br /> 00700-S <br /> 03/12 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.