Laserfiche WebLink
6.15 Hazard Communication Programs and other data as Engineer may require to <br /> enable Engineer to review the submittal for <br /> A. Contractor shall be responsible for coordi- the limited purposes required by Paragraph <br /> nating any exchange of material safety data sheets 6.17.D. <br /> or other hazard communication information required <br /> to be made available to or exchanged between or B. Where a Shop Drawing or Sample is re- <br /> among employers at the Site in accordance with quired by the Contract Documents or the Schedule <br /> Laws or Regulations. of Submittals , any related Work performed prior to <br /> Engineer's review and approval of the pertinent <br /> 6.16 Emergencies submittal will be at the sole expense and <br /> responsibility of Contractor. <br /> A. In emergencies affecting the safety or <br /> protection of persons or the Work or property at the C. Submittal Procedures <br /> Site or adjacent thereto, Contractor is obligated to <br /> act to prevent threatened damage, injury, or loss. 1. Before submitting each Shop Drawing or <br /> Contractor shall give Engineer prompt written notice Sample, Contractor shall have determined and veri- <br /> if Contractor believes that any significant changes in fled: <br /> the Work or variations from the Contract Documents <br /> have been caused thereby or are required as a a. all field measurements, quantities, dimen- <br /> result thereof. If Engineer determines that a change sions, specified performance and design <br /> in the Contract Documents is required because of criteria, installation requirements, materials, <br /> the action taken by Contractor in response to such catalog numbers, and similar information <br /> an emergency, a Work Change Directive or Change with respect thereto; <br /> Order will be issued. <br /> b. the suitability of all materials with respect <br /> 6.17 Shop Drawings and Samples to intended use, fabrication, shipping, han- <br /> dling, storage, assembly, and installation <br /> A. Contractor shall submit Shop Drawings pertaining to the performance of the Work; <br /> and Samples to Engineer for review and approval in <br /> accordance with the acceptable Schedule of c. all information relative to Contractor's <br /> Submittals (as required by Paragraph 2.07). Each responsibilities for means, methods, tech- <br /> submittal will be identified as Engineer may require. niques, sequences, and procedures of <br /> construction, and safety precautions and <br /> 1. Shop Drawings programs incident thereto; and <br /> a. Submit number of copies specified in the d. shall also have reviewed and coordinated <br /> General Requirements. each Shop Drawing or Sample with other <br /> Shop Drawings and Samples and with the <br /> b. Data shown on the Shop Drawings will be requirements of the Work and the Contract <br /> complete with respect to quantities, dimen- Documents. <br /> sions, specified performance and design <br /> criteria, materials, and similar data to show 2. Each submittal shall bear a stamp or <br /> Engineer the services, materials, and specific written certification that Contractor has satis- <br /> equipment Contractor proposes to provide fled Contractor's obligations under the Contract <br /> and to enable Engineer to review the Documents with respect to Contractor's review and <br /> information for the limited purposes required approval of that submittal. <br /> by Paragraph 6.17.D. <br /> 3. With each submittal, Contractor shall give <br /> 2. Samples: Contractor shall also submit Engineer specific written notice of any variations, <br /> Samples to Engineer for review and approval in that the Shop Drawing or Sample may have from the <br /> accordance with the acceptable schedule of Shop requirements of the Contract Documents. This notice <br /> Drawings and Sample submittals. shall be both a written communication separate from <br /> the Shop Drawing's or Sample Submittal; and, in <br /> a. Submit number of Samples specified in addition, by a specific notation made on each Shop <br /> the Specifications. Drawing or Sample submitted to Engineer for review <br /> and approval of each such variation. <br /> b. Clearly identify each Sample as to <br /> material, Supplier, pertinent data such as D. Engineer's Review <br /> catalog numbers, the use for which intended <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright 02002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700-24 <br /> 03/12 11-4179 <br />