Laserfiche WebLink
SECTION 00100 <br /> INSTRUCTIONS TO BIDDERS <br /> 1. DEFINITION OF TERMS <br /> 1.1 Bidding Documents - these include the Advertisement for Bid, Instructions <br /> to Bidders, Bid Form, sample bidding and contract forms, proposed <br /> Contract Documents as defined in the General Conditions and any <br /> Addenda issued prior to receipt of bids, addendum, pre-bid and meeting <br /> minutes. <br /> 1.2 Total Base Bid - the amount stated on the Bid Form for which the Bidder <br /> offers to perform the Work as described in the Bidding Documents. <br /> 1.3 Unit Price Bid - the amount stated in the Bid Form as a price per unit of <br /> measurement for materials or labor as described in the Bidding <br /> Documents. <br /> 1.4 Addenda - written and graphic documents issued by the Engineer prior to <br /> the execution of the Contract to modify or interpret the Bidding <br /> Documents. <br /> 1.5 General Conditions — 2002 Version of the Standard General Conditions of <br /> the Construction Contract. <br /> 1.6 Any Capitalized terms contained here-in (e.g. Owner, Engineer, Work, <br /> Agreement, Contract) and is not defined above are contained in the <br /> General Conditions Article 1 — Definitions and Terminology. <br /> 2. BIDDING DOCUMENTS <br /> 2.1 Complete sets of Bidding Documents may be obtained from Demand Star <br /> as stated in the Advertisement for Bid. <br /> 2.2 Complete sets of Bidding Documents shall be used by Bidders in <br /> preparation of Bids; neither the Owner nor the Engineer assume any <br /> responsibility for errors or misinterpretations resulting from the use of <br /> incomplete sets. <br /> 2.3 Bidding documents consist of this project manual along with the following <br /> construction plans titled: <br /> a. Newport Fishing Pier and Restaurant Utilities <br /> Bid No. ITB 12-10-01 <br /> CGA Project No. 11-4179 <br /> 08/12 00100-1 11-4179 <br />