|
field services required in connection therewith. All
<br /> cash discounts shall accrue to Contractor unless d. Sales, consumer, use, and other similar
<br /> Owner deposits funds with Contractor with which to taxes related to the Work, and for which
<br /> make payments, in which case the cash discounts Contractor is liable, imposed by Laws and
<br /> shall accrue to Owner. All trade discounts, rebates Regulations.
<br /> and refunds and returns from sale of surplus
<br /> materials and equipment shall accrue to Owner, and e. Deposits lost for causes other than negli-
<br /> Contractor shall make provisions so that they may gence of Contractor, any Subcontractor, or
<br /> be obtained. anyone directly or indirectly employed by
<br /> any of them or for whose acts any of them
<br /> 3. Payments made by Contractor to may be liable, and royalty payments and
<br /> Subcontractors for Work performed by fees for permits and licenses.
<br /> Subcontractors. If required by Owner, Contractor
<br /> shall obtain competitive bids from subcontractors f. Losses and damages (and related
<br /> acceptable to Owner and Contractor and shall expenses) caused by damage to the Work,
<br /> deliver such bids to Owner, who will then determine, not compensated by insurance or otherwise,
<br /> with the advice of Engineer, which bids, if any, will sustained by Contractor in connection with
<br /> be acceptable. If any subcontract provides that the the performance of the Work (except losses
<br /> Subcontractor is to be paid on the basis of Cost of and damages within the deductible amounts
<br /> the Work plus a fee, the Subcontractor's Cost of the of property insurance established in
<br /> Work and fee shall be determined in the same accordance with Paragraph 5.06.D),
<br /> manner as Contractor's Cost of the Work and fee as provided such losses and damages have
<br /> provided in this Paragraph 11.01. resulted from causes other than the negli-
<br /> gence of Contractor, any Subcontractor, or
<br /> 4. Costs of special consultants (including but anyone directly or indirectly employed by
<br /> not limited to Engineers, architects, testing laborato- any of them or for whose acts any of them
<br /> ries, surveyors, attorneys, and accountants) em- may be liable. Such losses shall include
<br /> ployed for services specifically related to the Work. settlements made with the written consent
<br /> and approval of Owner. No such losses,
<br /> 5. Supplemental costs including the damages, and expenses shall be included in
<br /> following: the Cost of the Work for the purpose of
<br /> determining Contractor's fee.
<br /> a. The proportion of necessary trans-
<br /> portation, travel, and subsistence expenses g.. The cost of utilities, fuel, and sanitary
<br /> of Contractor's employees incurred in dis- facilities at the Site.
<br /> charge of duties connected with the Work.
<br /> h. Minor expenses such as telegrams, long
<br /> b. Cost, including transportation and mainte- distance telephone calls, telephone service
<br /> nance, of all materials, supplies, equipment, at the Site, expresses, and similar petty
<br /> machinery, appliances, office, and tempo- cash items in connection with the Work.
<br /> rary facilities at the Site, and hand tools not
<br /> owned by the workers, which are consumed i. The costs of premiums for all bonds and
<br /> in the performance of the Work, and cost, insurance Contractor is required by the
<br /> less market value, of such items used but Contract Documents to purchase and
<br /> not consumed which remain the property of maintain.
<br /> Contractor.
<br /> B. Costs Excluded: The term Cost of the
<br /> c. Rentals of all construction equipment and Work shall not include any of the following items:
<br /> machinery, and the parts thereof whether
<br /> rented from Contractor or others in accor- 1. Payroll costs and other compensation of
<br /> dance with rental agreements approved by Contractor's officers, executives, principals (of
<br /> Owner with the advice of Engineer, and the partnerships and sole proprietorships), general
<br /> costs of transportation, loading, unloading, managers, safety managers, engineers, architects,
<br /> assembly, dismantling, and removal thereof. estimators, attorneys, auditors, accountants,
<br /> All such costs shall be in accordance with purchasing and contracting agents, expediters,
<br /> the terms of said rental agreements. The timekeepers, clerks, and other personnel employed
<br /> rental of any such equipment, machinery, or by Contractor, whether at the Site or in Contractor's
<br /> parts shall cease when the use thereof is no principal or branch office for general administration
<br /> longer necessary for the Work. of the Work and not specifically included in the
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract
<br /> Copyright 0 2002 National Society of Professional Engineers for EJCDC. All rights resen'ed.
<br /> 00700-32
<br /> 03/12 11-4179
<br />
|