My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Application for Payment within 30 days after it is <br /> E. Where Contractor's services have been submitted, or (iii) Owner fails for 30 days to pay <br /> so terminated by Owner, the termination will not Contractor any sum finally determined to be due, <br /> affect any rights or remedies of Owner against then Contractor may, upon seven days written notice <br /> Contractor then existing or which may thereafter to Owner and Engineer, and provided Owner or <br /> accrue. Any retention or payment of moneys due Engineer do not remedy such suspension or failure <br /> Contractor by Owner will not release Contractor from within that time, terminate the Contract and recover <br /> liability. from Owner payment on the same terms as provided <br /> in Paragraph 15.03. <br /> F. If and to the extent that Contractor has <br /> provided a performance bond under the provisions B. In lieu of terminating the Contract and <br /> of Paragraph 5.01.A, the termination procedures of without prejudice to any other right or remedy, if <br /> that bond shall supersede the provisions of Engineer has failed to act on an Application for <br /> Paragraphs 15.02.B, and 15.02.C. Payment within 30 days after it is submitted, or <br /> Owner has failed for 30 days to pay Contractor any <br /> 15.03 Owner May Terminate For Convenience sum finally determined to be due, Contractor may, <br /> seven days after written notice to Owner and <br /> A. Upon seven days written notice to Engineer, stop the Work until payment is made of all <br /> Contractor and Engineer, Owner may, without cause such amounts due Contractor, including interest <br /> and without prejudice to any other right or remedy of thereon. The provisions of this Paragraph 15.04 are <br /> Owner, terminate the Contract. In such case, not intended to preclude Contractor from making a <br /> Contractor shall be paid for (without duplication of Claim under Paragraph 10.05 for an adjustment in <br /> any items): Contract Price or Contract Times or otherwise for <br /> expenses or damage directly attributable to <br /> 1 completed and acceptable Work executed Contractor's stopping the Work as permitted by this <br /> in accordance with the Contract Documents prior to Paragraph. <br /> the effective date of termination, including fair and <br /> reasonable sums for overhead and profit on such <br /> Work; ARTICLE 16 - DISPUTE RESOLUTION <br /> 2. expenses sustained prior to the effective <br /> date of termination in performing services and fur- 16.01 Methods and Procedures <br /> nishing labor, materials, or equipment as required by <br /> the Contract Documents in connection with uncom- A. Either Owner or Contractor may request <br /> pleted Work, plus fair and reasonable sums for mediation of any Claim submitted to Engineer for a <br /> overhead and profit on such expenses; decision under Paragraph 10.05 before such <br /> decision becomes final and binding. The mediation <br /> 3. all claims, costs, losses, and damages will be govemed by the Construction Industry <br /> (including but not limited to all fees and charges of Mediation Rules of the American Arbitration <br /> engineers, ' architects, attorneys, and other Association in effect as of the Effective Date of the <br /> professionals and all court or arbitration or other Agreement. The request for mediation shall be <br /> dispute resolution costs) incurred in settlement of submitted in writing to the American Arbitration <br /> terminated contracts with Subcontractors, Suppliers, Association and the other party to the Contract. <br /> and others; and Timely submission of the request shall stay the <br /> effect of Paragraph 10.O5.E. <br /> 4. reasonable expenses directly attributable <br /> to termination. B. Owner and Contractor shall participate in <br /> the mediation process in good faith. The process <br /> B. Contractor shall not be paid on account of shall be concluded within 60 days of filing of the <br /> loss of anticipated profits or revenue or other eco- request. The date of termination of the mediation <br /> nomic loss arising out of or resulting from such shall be determined by application of the mediation <br /> termination. rules referenced above. <br /> 15.04 Contractor May Stop Work or Terminate C. If the Claim is not resolved by mediation, <br /> Engineer's action under Paragraph 10.05.0 or a <br /> A. If, through no act or fault of Contractor, (i) denial pursuant to Paragraphs 10.05.C.3 or 10.05.D <br /> the Work is suspended for more than 90 consecutive shall become final and binding 30 days after <br /> days by Owner or under an order of court or other termination of the mediation unless, within that time <br /> public authority, or (ii) Engineer fails to act on any period, Owner or Contractor: <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright D 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700-13 <br /> 03/12 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.