Laserfiche WebLink
6. Upon mutual agreement by Owner and Contractor, payment in full may be <br /> made to those Subcontractors whose Work is fully completed during the early <br /> stages of the Project. Notwithstanding Paragraphs 14.02.A.8 and 14.02.C.5 <br /> above, at such times as the Work as set forth in the schedule of values has <br /> been 50% completed, and upon mutual agreement of the Owner and <br /> Contractor, no further Retainage shall be withheld from progress payments <br /> with respect to such portion of the Work. Agreement as to any such <br /> reduction in retained amounts will not constitute a waiver of or otherwise <br /> prejudice the Owner's right to subsequently reinstate full retainage, as to that <br /> subcontractor, should circumstances justify such action in the Owner's sole <br /> judgment. <br /> 7. Upon Substantial Completion of the entire Work of the Contractor, a sum, <br /> sufficient to increase payments to the Contractor to one hundred percent <br /> (100%) of the Contract Sum, less amounts, if any for incomplete Work and <br /> unsettled claims, shall be paid to Contractor with the next sequential payment <br /> application after Substantial Completion is obtained. <br /> Delete Paragraph 14.05 and replace with the following: <br /> A. The Owner may occupy or use any completed or partially completed portion of <br /> the Work at any stage when such portion is designated by separate <br /> agreement with the Contractor, provided such occupancy or use is consented <br /> by the insurer, in accordance with Paragraph 5.06.A.5 and as authorized by <br /> public authorities having jurisdiction over the Work. Such partial occupancy <br /> or use may commence whether or not the portion is substantially complete, <br /> provided Owner and Contractor have accepted in writing the responsibilities <br /> assigned to each of them for payments, Retainage, if any, security, <br /> maintenance, heat, utilities, damage to Work and insurance, and have agreed <br /> in writing concerning the period for correction of Work and commencement of <br /> warranties required by the Contract Documents. When the Contractor <br /> considers a portion substantially complete, the Contractor shall prepare and <br /> submit a comprehensive list to the Engineer of the items to be completed or <br /> corrected prior to final payment. The Failure to include an item on such list <br /> does not alter the responsibility of the Contractor to complete all Work in <br /> accordance with the Contract Documents. Consent of the Contractor to <br /> partial occupancy or use shall not be unreasonably withheld. The stage of <br /> the progress of the Work shall be determined by written agreement between <br /> the Owner and the Contractor, or if no agreement is reached, by decision of <br /> the Engineer. <br /> B. Immediately or prior to such partial occupancy or use, the Owner, Contractor, <br /> and Engineer shall jointly inspect the area to be occupied or the portion of the <br /> Work to be used in order to determine and record the condition of the Work. <br /> C. Unless otherwise agreed upon, partial occupancy or use of a portion or <br /> portions of the Work shall not constitute acceptance of the Work not <br /> complying with the Contract Documents." <br /> • <br /> 08/12 00800-9 11-4179 <br />