My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2682
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2682
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 2:54:38 PM
Creation date
5/9/2017 2:53:38 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2682
Date (mm/dd/yyyy)
04/20/2017
Description
Agmt with Safeware, Inc. for Installation of Phase II of the Citywide CCTV System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SafeWare® <br /> SAFETY•SERVICE•RESPONSE <br /> SPF GBIC MODULE for field switch req.for multi-mode-Z09 EA GBIC SM 2 12 <br /> Fiber Optics LIU Connector Housing for field mount-Z09 EA CORRIN LIU 6 6 <br /> VMS NEMA ENCLOSURE PACKAGE(Includes: All necessaryEA CUSTO CUST 6 6 <br /> Mounting Brackets)- large Form -Z09 M OM <br /> 31400 1 <br /> 1-Channel of Net Video. -Z09 EA VMS 1 6 16 <br /> 1- 1 <br /> 1-Channel SUSP EA VMS SUSP 6 16 <br /> CONFIG. SERVER FOR FIELD MOUNTED APPLICATIONS- UP Field <br /> TO 20 CHANNELS EA VMS Mt. 2 2 <br /> CABLING INFRASTRUCTURE- FIBER AND COPPER FT ATCI ATCI 1 1 <br /> LABOR INSTALLATION, DEVICE MOUNTING, HAND <br /> DIGGNING IN NECESSARY AREAS PROGRAMMING AND HR ATCI ATCI 1 1 <br /> SETUP-Z09 <br /> AS BUILTS DRAWINGS AND ENGINEERING-Z09 EA ATCI ATCI 1 1 <br /> PROJECT MANAGEMENT-Z09 EA ATCI ATCI 1 1 <br /> MISCELLANEOUS COST- Flex, CONNECTORS,Velcro, EA ATCI ATCI 1 1 <br /> plenum components, etc. <br /> TOTAL COST OF PROJECT $171,909.48 <br /> 14 IPage <br /> 7. <br /> l� t <br />
The URL can be used to link to this page
Your browser does not support the video tag.