My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2682
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2682
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 2:54:38 PM
Creation date
5/9/2017 2:53:38 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2682
Date (mm/dd/yyyy)
04/20/2017
Description
Agmt with Safeware, Inc. for Installation of Phase II of the Citywide CCTV System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALTC49,-, Safe Ware® <br /> SAFETY•SERVICE•RESPONSE <br /> WS- <br /> CISCO SWITCH ** -Z07 EA Cisco C2960S- 1 1 <br /> 24TS-L <br /> CISCO SWITCH WITH GBIC MODULES-Z07 EA Cisco GBIC 2 2 <br /> Tri <br /> KVM W/17" LCD MONITOR-Z07 EA itpe I 17" slide 1 1 <br /> Y <br /> CABLING INFRASTRUCTURE-COPPER AND FIBER FT ATCI ATCI 1 1 <br /> LABOR INSTALLATION, DEVICE MOUNTING, 18 189 <br /> PROGRAMMING AND SETUP-Z07 HR ATCI ATCI 95 5 <br /> AS BUILTS DRAWINGS AND ENGINEERING-Z07 EA ATCI ATCI 60 60 <br /> PROJECT MANAGEMENT EA ATCI ATCI 0 300 <br /> MISCELLANEOUS COST- Flex, CONNECTORS, EA ATCI ATCI 1 1 <br /> Velcro, plenum components, etc. <br /> TOTAL COST OF PROJECT $429,663.23 <br /> 28 Page <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.