My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2684
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2684
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 3:11:28 PM
Creation date
5/9/2017 2:57:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2684
Date (mm/dd/yyyy)
04/20/2017
Description
5th Amend to Agmt w/RJ Behar for Eng. & Arch. Svcs. at Samson Oceanfront Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. R.J.Behar & Company, Inc. <br /> Engineers Planner s <br /> Consultant Work Order Proposal—City of Sunny Isles Beach <br /> ENGINEERING AND ARCHITECTURAL SERVICES FOR <br /> SAMSON OCEANFRONT PARK <br /> R.J. Behar & Company, Inc. (RJ Behar) proposes to provide engineering and <br /> architectural services for improvements to Samson Oceanfront Park located at SR AlA <br /> (Collins Avenue) and NE 174th Street in the City of Sunny Isles Beach; pursuant to its <br /> Professional Services Agreement with the City of Sunny Isles Beach, Florida. <br /> . 1. PROJECT DESCRIPTION: <br /> The project consists of improvements to the existing Samson Oceanfront Park. The <br /> design services will include: survey, sewer line upgrades with an on-site lift station, ADA <br /> upgrades, sidewalk and curb cuts improvements, site lighting, miscellaneous site <br /> geometry corrections, existing restroom improvements, interior lighting improvements, <br /> electrical service upgrade to 3 phase, and Environmental Coastal Construction Control <br /> Line (CCCL) permitting. This proposal also includes a Conceptual Landscape Layout <br /> (CLL) to be used as the basis for Landscape Plan fees to be determined after approval of <br /> the CLL. Additionally this proposal establishes an allowance for geotechnical services <br /> that may be needed for the restroom improvements design. This proposal does not <br /> include post design/construction assistance services, which will be determined and <br /> negotiated at a later date. <br /> II. ENGINEERING SERVICES: <br /> 1.1 Site Visit and Assessment <br /> RJ Behar shall conduct one field visit in,order to better familiarize staff with <br /> the location of existing facilities as well as site specific constraints due <br /> consideration during the conceptual planning of the proposed improvements. <br /> 1.2 Data Collection <br /> This task will include obtaining and reviewing existing right of way and <br /> utility information, reviewing Maintenance of Traffic (MOT) requirements, <br /> identifying permit requirements, etc. <br /> 1.3 Site Improvements Plan <br /> This task will include developing a master site plan based on the survey and <br /> providing vertical and horizontal control for all proposed improvements. <br /> 1.4 ADA Compliance Improvements <br /> This task will consist of evaluating the existing site for ADA deficiencies and <br /> developing details to bring the site up to compliance. <br /> 1.5 Covered Performance Area <br /> This will determine location of proposed covered performance area and <br /> prepare location to accommodate prototype/prefabricated structure. <br /> Work Order Proposal Samson Oceanfront Park Services SB <br /> City of Sunny Isles Beach Page 1 of 6 <br /> ATTACHMENT "A" . <br />
The URL can be used to link to this page
Your browser does not support the video tag.