Laserfiche WebLink
Documents may supersede the manufacturer's standard warranty. <br /> ARTICLE 22. CHANGES IN THE WORK OR TERMS OF CONTRACT DOCUMENTS <br /> 22.1 Without invalidating the Agreement and without notice to any Surety, the City reserves <br /> and shall have the right, from time to time to make such increases, decreases or other changes in <br /> the character or quantity of the Work as may be considered necessary or desirable to complete fully <br /> and acceptably the proposed construction in a satisfactory manner. Any extra or additional work <br /> must be issued in writing in accordance with the requirements of this Agreement. <br /> 22.2 Any changes to the terms of the Contract Documents must be contained in a written <br /> document, executed by the parties hereto, with the same formality and of equal dignity prior to <br /> the initiation of any Work reflecting such change. This Article shall not prohibit the issuance of <br /> Change Orders executed only by the City as hereinafter provided. <br /> 22.3 Contractor shall increase or decrease the value of the Performance and Payment Bonds <br /> to reflect the Contract Amount, as it may be revised. <br /> ARTICLE 23. OSHA COMPLIANCE AND SAFETY PRECAUTIONS <br /> 23.1 The Contractor warrants that it will comply with all safety precautions as required by <br /> federal, state or local laws, rules, regulations and ordinances <br /> 23.2 Contractor warrants that it will adhere to the applicable environmental protection <br /> guidelines for the duration of the Work. If hazardous waste materials are used, detected or <br /> generated at any time, the City Manager or his designee must be immediately notified of each <br /> and every occurrence. The Contractor shall comply with all codes,ordinances, rules, orders and <br /> other legal requirements of public authorities (including, without limitation, OSHA, EPA, <br /> DERM, the City of Sunny Isles Beach, Miami-Dade County, State of Florida, and Florida <br /> Building Code) which bear on the performance of the Work. <br /> 23.3 If an emergency condition should develop during the Work, the Contractor must <br /> immediately notify the City Manager or his designee of each and every occurrence. The <br /> Contractor should also recommend any appropriate course(s) of action to the City. <br /> ARTICLE 24. PRIORITY OF PROVISIONS <br /> 24.1 If there is a conflict or inconsistency between any term, statement requirement, or <br /> provision of any Exhibit or Attachment hereto, any document or events referred to herein, or any <br /> document incorporated into the Contract Documents by reference and a term, statement, <br /> requirement, specifications and plans,or provision of the Contract Documents,the following order <br /> of precedence shall apply: <br /> 24.2 In the event of conflicts in the Contract Documents the order of precedence stated <br /> below shall govern. <br /> • Revisions and Change Orders to this Agreement <br /> • This Agreement, as it may be amended from time to time <br /> • Plans and Specifications <br /> • RFP No. 14-11-01, and any addendums issued thereto <br /> I4 <br /> 8 <br />