My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No. 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-05-01 Landscape Maintenance
>
Addendum No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 11:11:52 AM
Creation date
5/30/2017 11:07:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Proposal No. 12-05-01 36A <br /> <br />off-loaded in a location designated by the City. <br /> <br />3.10.5 K. MISCELLANEOUS ITEMS (see section K of the bid form) <br /> <br />This proposal item is to include the supplying of all necessary materials, supplies, labor, <br />equipment, fuel, and other miscellaneous necessities to conduct the following task. <br /> <br /> K1 DEAD ANIMALS <br /> <br />Properly and legally dispose of any dead animals located within the City limits, <br />when requested to do so by the City. The animal must be removed within six <br />hours of the request if the request is made between 5:00pm and 7:00am and <br />within two hours if the request is made between 7:00am and 5:00pm. Though <br />these are the maximum times allowed to respond, it is intended that the <br />Proposers will always respond immediately. The proposer shall be available 7 <br />days a week. <br /> <br />K2 BASEBALL FIELD CLAY <br /> <br />Properly maintain all clay surfaces on the baseball field at Pelican Community <br />Park. This will include dragging the field, servicing the pitcher’s mound, and <br />replacing any materials necessary to have an excellent playing surface. <br /> <br />To maintain the baseball field, the Contractor shall drag, grade, stripe, and <br />smooth the clay infield, including base paths, warning track and batting cage <br />(days to be determined by City, including Sundays). The City will advise the <br />Contractor of additional field preparation, as needed, with a minimum of six <br />hours notice. The Contractor shall tamp mound area two times per week and fill <br />in existing holes with available clay (supplied by Contractor) and firm the area <br />with a hand tamp. <br /> <br />K3 BASEBALL FIELD STRIPING <br /> <br />Stripe the baseball field in Pelican Community Park. This shall include the foul <br />lines (to the outfield fence) and all accompanying areas, using chalk powder, the <br />striping shall be done to industry standards and shall follow the <br />recommendations of the manufacturer. <br /> <br />K4 SOCCER FIELD STRIPING <br /> <br />Stripe the soccer field at Gwen Margolis Park. This will require striping all lines <br />necessary to provide an appropriate regulation field, using paint. The striping <br />shall be done to industry standards and shall follow the recommendations of the <br />manufacturer. <br /> <br />K5 REPLACE / REPAIR NETTING
The URL can be used to link to this page
Your browser does not support the video tag.