My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 13-10-02 Construction of a Wall Under W. Lehman Causeway
>
Add No 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 11:36:57 AM
Creation date
5/30/2017 11:36:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Addendum No. 3 <br /> <br />CITY OF SUNNY ISLES BEACH <br />CONSTRUCTION OF WALL UNDER THE WILLIAM LEHMAN CAUSEWAY <br />CITY RFP NO. 13-10-02 <br /> <br />To All Bidders: <br /> <br />Bidders for the above referenced project shall take note of the following changes, additions, <br />deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the <br />Contract Documents shall become a part of and have precedence over anything shown or <br />described otherwise. <br /> <br /> <br /> Please be advised that the Bid Drawings have been revised. Please refer to Rev No. 3 dated <br />01-29-14 on provided plan set. <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.