Laserfiche WebLink
<br />Addendum No. 2 <br /> <br />CITY OF SUNNY ISLES BEACH <br />ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT <br />CITY RFP NO. 14-04-01 <br /> <br />To All Bidders: <br /> <br />Bidders for the above referenced project shall take note of the following changes, additions, <br />deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the <br />Contract Documents shall become a part of and have precedence over anything shown or <br />described otherwise. <br /> <br /> <br /> Correction - Sheet EE-02: Lighting Fixture Schedule, Fixture B Manufacturer and Catalog No <br />should be RAB Lighting HB101B with HH1B hood and 20W PAR38 40° Ultra LED Flood Lights <br />with 120 V, 3000K CRI 82, 1300 Lumen and 25,000 hour life or greater not RAB HBLED 10A as <br />called out in the plan sheet. <br /> <br /> Plan Sheet ST-02: Proposed steel reinforcement within the cupola shall be galvanized. <br /> <br /> Please be advised that the Bid Drawing sheet LM-01 has been revised. Refer to Rev No. 1 <br />dated 2014-04-23 on provided plan sheet. <br /> <br /> All bid questions must be issued in writing to the City Clerk no later than Wednesday Aril <br />30th, 2014. <br /> <br /> No wind load calculations will be required for the bus shelter. <br /> <br /> See attached Bid Exhibit 1 for clarification on limits of milling and resurfacing within Bayview <br />Drive and areas within the right-of-way of Bayview Drive available for staging. Bidders are <br />reminded that a Staging Plan will be required prior to the start of work, along with a <br />Hurricane Preparedness Plan. <br /> <br />END OF SECTION