My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-04-01 Arlen House Right-of-Way Improvement
>
Add No 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 2:25:42 PM
Creation date
5/30/2017 2:25:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Addendum No. 3 <br /> <br />CITY OF SUNNY ISLES BEACH <br />ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT <br />CITY RFP NO. 14-04-01 <br /> <br />To All Bidders: <br /> <br />Bidders for the above referenced project shall take note of the following changes, additions, <br />deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the <br />Contract Documents shall become a part of and have precedence over anything shown or <br />described otherwise. <br /> <br /> <br /> Florida oolite for column and cupola construction shall be white with white grout. <br /> <br /> Bid form has been revised to include: <br />o Additional Bahia Grass to replace existing sod within Arlen House extending from the <br />proposed wall to the existing edge of pavement along the full length of the wall. <br />(Refer to bid form item #56) <br />o Replacement of existing concrete sidewalk within the Arlen House property. The <br />existing concrete sidewalk called out as “to remain” shall be removed and replaced <br />with a new 4” concrete sidewalk (min 3.5 ft wide) with detectable warning, <br />extending from the gate to the existing edge of pavement. (Refer to bid form items <br />46 and 47) <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.