Laserfiche WebLink
Addendum No. 4 <br />ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT <br />CITY RFP NO. 14-04-01 <br /> <br /> <br />(4) Prior to building permit, the Contractor may be required to submit shop drawings, <br />computations and other analysis in sufficient detail to substantiate proposed <br />changes. Such analysis shall be signed and sealed by the Contractor’s Engineer of <br />Record at no additional cost to the project. <br /> <br /> <br /> <br />END OF SECTION <br /> <br />2 <br /> <br />