My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFC 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-04-01 Arlen House Right-of-Way Improvement
>
RFC 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 2:26:29 PM
Creation date
5/30/2017 2:26:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Request for Clarification No. 2 <br /> <br />CITY OF SUNNY ISLES BEACH <br />ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT <br />CITY RFP NO. 14-04-01 <br /> <br />To All Bidders: <br /> <br />Bidders for the above referenced project shall take note of the following changes, additions, <br />deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the <br />Contract Documents shall become a part of and have precedence over anything shown or <br />described otherwise. <br /> <br /> <br /> Questions/Clarifications: <br /> <br />1. Section 2.12 states that the proposer shall furnish adequate supervision. Please define <br />“adequate” supervision. Is it the City’s intention to have a full time Superintendent and Project <br />Manager? <br /> <br />Response: <br />The Proposer provide shall provide staffing and resources as they deem fit to ensure that <br />the project is completed in accordance with the contract documents/specification, <br />contract terms and schedule. <br /> <br /> <br />2. Section 2.13 states that all unusable material and debris shall be removed from premises at <br />the end of each workday. <br />a. Please define unusable material and debris. <br />b. Will stock piling of demo material or fill be allowed over night? <br /> <br />Response: <br />a. “Unusable material” refers to any substance unsuitable to be incorporated in the work <br />as described in RFP No 14-04-01. <br /> <br />b. Stock piling of discarded material will not be permitted overnight. Contractor shall <br />ensure that stockpiling of all surplus materials, equipment, usable forms etc be limited <br />to dedicated staging areas. The City accepts no liability for any loss of materials, by <br />theft or otherwise, or for any damage to the stored materials. The site directly abuts <br />a residential community, and as such should be maintained in a clean and orderly <br />manner throughout the entire length of work under this Contract. Contractor shall not <br />dispose of materials of any character, rubbish or equipment, on abutting property or <br />public right-of-way, with or without the consent of the property owners. <br />
The URL can be used to link to this page
Your browser does not support the video tag.