My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFC 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-04-01 Arlen House Right-of-Way Improvement
>
RFC 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 2:26:29 PM
Creation date
5/30/2017 2:26:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Clarification No. 2 <br />ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT <br />CITY RFP NO. 14-04-01 <br /> <br /> <br />existing elements, if required to facilitate reinstallation. It is assumed that replacement <br />of the existing bus shelter will not be required. <br /> <br /> <br />5. Will a permit be required for the temporary fence? <br /> <br />Response: <br />Yes. A building permit will be required for the temporary construction fence. The successful <br />contractor will be required to submit plans, details and the pertinent applications to the City <br />building department for review and approval prior to the start of work. <br /> <br /> <br />6. Please clarify the difference between Line Item #5 and Line Item #6 <br /> <br />Response: <br />All Bidders are directed to eliminate item #5 – Furnish and Install temporary 6-ft tall security <br />fence along the Arlen House property. Bid item #6 – Temporary construction fencing shall <br />include ALL temporary fencing required for the project duration, including security fencing <br />along the Arlen House limits. <br /> <br /> <br />7. Line Item #18 is a Lump Sum about for Existing Utility Investigation of Project Limits. (Private <br />and Public) Will the City require this information to be added on the As-Builts? <br /> <br />Response: <br />Yes. The contractor will be required to depict this information on the final project as-builts, in <br />accordance with the as-built requirements outlined in the bid specifications. <br /> <br /> <br />8. Line Item #19 – Turnout Construction; please confirm this line item is for the restoration of the <br />proposed staging area on Bayview Drive. The line item does not call for the restoration of the <br />existing striping within the proposed staging area. <br /> <br />Response: <br />This line item refers to the construction of the vehicular access drive to the Arlen House <br />property. Bidders are directed to line item 80 – Mill and Resurface of Bayview Drive from Collins <br />Ave to guard house, for restoration of Bayview Drive. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.