My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(14-06-02) Emergency Debris Clearing and Removal
>
Add No 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2017 10:21:39 AM
Creation date
6/12/2017 10:21:06 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Engineer Individual Hour $__________ <br />Equipment Operator Individual Hour $__________ <br />Truck Driver Individual Hour $__________ <br />Administrative Assistant Individual Hour $__________ <br />Clerical Individual Hour $__________ <br />Field Hazardous Material Manager Individual Hour $__________ <br />Haz Mat Containment Area Supervisor Individual Hour $__________ <br />Haz Mat Containment Area Foreman Individual Hour $__________ <br />Field Haz Mat Technician Individual Hour $__________ <br />Haz Mat Containment Area Technician Individual Hour $__________ <br />Field Project Supervisor Individual Hour $__________ <br />Field Project Foreman Individual Hour $__________ <br />Project Geologist Individual Hour $__________ <br />Project Chemist Individual Hour $__________ <br />Regulatory Manager Individual Hour $__________ <br />Asbestos Abatement Supervisor Individual Hour $__________ <br />Asbestos Abatement Worker Individual Hour $__________ <br />Asbestos Inspector Individual Hour $__________ <br />Marine Resources (Fuel, maintenance included) <br />56' Shallow Draft Landing Craft with Crane Crew of 2 Day $__________ <br />40' Sectional Barge vi/ Mounted Excavator & Pushboat With Crew Day $__________ <br />33' Fast Barge with Winch Crew of 2 Day $__________ <br />14' Utility Boat with Motor (Work Boat) With Crew Day $__________ <br />12' Utility Boat with Motor (Work Boat) With Crew Day $__________ <br />12' Utility Boat without Motor (Work Boat) With Crew Day $__________ <br />Tank Diver with Gear Individual Hour $__________ <br />Hardhat Diver with Gear Individual Hour $__________ <br />Scuba Bottle Refill (Air) 80 Each $__________ <br />Air Pump with multi breathing lines Brownie Lung Day $__________ <br />Miscellaneous Equipment/Items (Fuel, maintenance included where applicable) <br />16
The URL can be used to link to this page
Your browser does not support the video tag.