My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(13-08-01) Design build svcs for Gateway Park Pedestrian bridge- STEP 1
>
Addendum 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 3:08:22 PM
Creation date
6/14/2017 3:08:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Addendum No. 2 <br /> <br />CITY OF SUNNY ISLES BEACH <br />GATEWAY PARK PEDESTRIAN ACCESS IMPROVEMENTS <br />CITY RFQ NO. 13-08-01: STEP 2 <br /> <br />To All Bidders: <br /> <br />Bidders for the above referenced project shall take note of the following changes, additions, <br />deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract <br />Documents shall become a part of and have precedence over anything shown or described <br />otherwise. <br /> <br /> <br /> Questions/Clarifications: <br /> <br />1. The above referenced RFQ indicates that Construction completion can be no later than 7/1/15 <br />and that the project had liquidated damages. We were unable to find the dollar value of <br />liquidated damages per day. Please advise. <br /> <br /> <br />Response: Liquidated damages shall be assessed at a rate of $500.00 (Five hundred dollars) for <br />each day beyond the time specified for completion. <br /> <br />2. Can you please provide construction documents for the adjacent project? We’ll be glad to pick <br />up a CD. <br /> <br />Response: This question was previously addressed in Addendum 01 which was issued to bidders <br />on 05/19/2014. See below previously issued response: <br /> <br />3. Please provide the site plans and elevations from the adjacent Gateway project plan <br />that indicate where the planned and already built elements and structures will be <br />located, showing the dimensions and locations of the reserved area that Gateway <br />project has reserved for the base and tower of the pedestrian bridge on the south side of <br />the road. <br /> <br />Response: Proposers may contact the Building Department for plans and otherwise <br />familiarize themselves with the status of construction. <br /> <br />Per standard City procedure, bidders are advised to submit a public records request through the <br />Clerk’s office, at which point they can come to the Building Department to view the plans. <br /> <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.