Laserfiche WebLink
drawings if required for permit. If approved work exceeds the allowance the <br />cost will be equitably adjusted. <br /> <br />32 Owner’s allowance for Structural augmentation and <br />miscellaneous building and system installation and repairs or <br />upgrades including but not limited to <br /> <br />Additional wiring for generators <br /> <br />Remote electrical controls and rewiring to implement <br />4th floor standby generator installation and operation. <br /> <br />Reinforcement of existing parking garage building to support generators and <br />related equipment including support of connection of plumbing, and <br />electrical equipment and Pre-design and engineering and miscellaneous <br />repairs to CSIBF grounds and facilities including engineered, signed and <br />sealed shop drawings The contractor will obtain building permits. <br /> <br />Allowance may be applied to miscellaneous laboratory testing including <br />petrographic Analysis and Soil Borings. <br /> <br />Contractor shall provide labor and material to install structural reinforcement <br />for the support of the generators and related equipment and installation <br />installed on the 4th floor of the garage. The structural load capacity of the <br />parking garage deck is approximately 50 PSF, the weight of each generator <br />is TBD, the contractor and engineer shall verify structural loads and <br />reinforce the structure if required. <br /> <br />If the approved work exceeds the allowance the cost will be equitably <br />adjusted. <br />$125,000 <br />33 Allowance for PCP Heritage Parking de-lam of the garage <br />building <br />$100,000 <br />34 notes Applies to all above items <br /> 1 Permit fees and costs allowance are by owner <br /> 2 Contractor is required to have an active License for Means Construction Cost <br />Data and P-6 <br /> <br /> 3 Contractor is required to produce schedules in Primavera P-6 scheduling <br />software including monthly updates <br /> <br /> 4 Items not specifically included in base bid , unit prices or alternates may be <br />added as change orders as may be negotiated under the procurement rules <br />of the City but are not in contract <br /> <br /> 5 Work for preparation of signed and sealed engineering or architectural <br />drawings includes all site visits and meetings and pre-design work required <br />to develop plans and specs for full scope of work. <br /> <br /> 6 NIC means not in contract and NTE means not to exceed <br /> 7 Base project to be completed working 180 days from notice to proceed <br /> 8 Warranty runs from date of substantial completion of each installed work or <br />phase for 1 calendar year <br /> <br />