Laserfiche WebLink
Tuesday, September 23, 2014 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Addendum No. 1 <br /> <br />CITY OF SUNNY ISLES BEACH <br />Construction of the North Bay Road Pedestrian Emergency Bridge <br />CITY RFP NO. 14-09-01 <br /> <br />To All Bidders: <br /> <br />Bidders for the above-referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br /> <br /> Please follow the link below to access the remaining documents for this RFP: <br /> <br />https://www.dropbox.com/sh/j6hw5h23s9keoiq/AAAUduLsWLNoBZ5f8-X_d4bka?dl=0 <br /> <br /> The above link includes the following documents: <br /> <br />1. Attachment “A” – Supplemental Scope of Work <br />2. Bridge Plans <br />3. Bridge Structural Plans <br />4. Permanent Retaining Wall Plans <br />5. Reinforcement Wall Plans <br />6. Construction Requirements for Retaining Wall System (Wall – <br />ARES) <br />7. SFWMD Permit <br />8. Army Corps of Engineers’ Permit <br />9. Preliminary Approval from DERM <br />10. Geotechnical Report <br /> <br /> <br />END OF SECTION