Laserfiche WebLink
71 5' x 4' Exfiltration Trench 356 LF <br />72 Core Existing Manhole (18" RCP)1 EA <br />73 SUBTOTAL DRAINAGE <br />74 BRIDGE <br />75 <br />South Bridge Approach (Sta 20+54.14- <br />21+29.73)-(inclusive of all excavation, soil <br />remediation, compaction, testing, <br />hauling/disposal of unsuitable material, <br />MSE walls purchase and installation, <br />concrete work and asphalt) <br />1 LS <br />76 <br />North Bridge Approach -(STA 24+54.15- <br />26+29.96) (inclusive of all excavation, soil <br />remediation, compaction, testing, <br />hauling/disposal of unsuitable material, <br />MSE walls purchase and installation, <br />concrete work and asphalt) <br />1 LS <br />77 <br />FDOT Bridge Approach to Approach (Sta <br />21+29.73-24+54.15)1 LS <br />78 <br />Labor and Material to F&I all electrical <br />components per plans 1 LS <br />79 F&I Type B Fencing FDOT Index 802 105 LF <br />80 <br />F&I Decorative Vertical Fence to Match <br />Existing w/ Double Traffic Gate and Single <br />Ped Gate <br />300 LF <br />81 SUBTOTAL BRIDGE <br />TOTAL BASE BID (ITEMS 1 THROUGH 81)$ <br />We have included herewith, the required security Bid Bond, as required by the Instruction to Bidders. <br />All applicable federal state and local taxes and permit fees are included in the Bid Price. <br />Permit fees shall be in accordance with the Owner's rate schedule. <br />All unit rates are inclusive of all material, labor, equipment, excavation, handling, rehandling, temporary storage <br />of material, installation, backfill, testing, compaction, hauling/disposal of any unsuitable material and <br />restoration of any affected areas. <br />(*) Grand total must equal amount shown on line "TOTAL LUMP SUM BID PRICE WITH SCHEDULE OF <br />VALUES OF:" on Bid Form for Section 1.