Laserfiche WebLink
Tree Name DBH” <br />174th Street Tree Relocation Bid Form <br />Item <br />Number DispositionSpread / Ft.Ht./ft.New Location Relocation Cost <br />11-5-2014The City Of Sunny Isles, Florida <br />Project Phase <br />Chinese Fan Palm 4108 Relocate610 Intracoastal Park North $1 Subtotal (174th St. Right of Way Improvements): <br />Chinese Fan Palm 4109 Relocate610 Intracoastal Park North $1 Subtotal (174th St. Right of Way Improvements): <br />Mexican Fan Palm 8110 Relocate55 Pelican Community Park $1 Subtotal (174th St. Right of Way Improvements): <br />Chinese Fan Palm 4111 Relocate610 Intracoastal Park North $1 Subtotal (174th St. Right of Way Improvements): <br />Chinese Fan Palm 4112 Relocate610 Intracoastal Park North $1 Subtotal (174th St. Right of Way Improvements): <br />Keys ThatChinese Fan Palmch <br />Palm <br />4113 Relocate66 Intracoastal Park North $1 Subtotal (174th St. Right of Way Improvements): <br />Chinese Fan Palm 4114 Relocate68 Intracoastal Park North $1 Subtotal (174th St. Right of Way Improvements): <br />Chinese Fan Palm 4115 Relocate610 Intracoastal Park North $1 Subtotal (174th St. Right of Way Improvements): <br />Seagrape Tree 16116 Remove2424 $1 Subtotal (174th St. Right of Way Improvements): <br />Seagrape Tree 16117 Remove3024 $1 Subtotal (174th St. Right of Way Improvements): <br />Silver Buttonwood Tree 14118 Remove2018 $1 Subtotal (174th St. Right of Way Improvements): <br />Silver Buttonwood Tree 24119 Remove2418 $1 Subtotal (174th St. Right of Way Improvements): <br />Washingtonia Palm 8121 Relocate820 Pelican Community Park $1 Subtotal (174th St. Right of Way Improvements): <br />Seagrape Tree 16122 Remove2424 $1 Subtotal (174th St. Right of Way Improvements): <br />8Page of 11 <br />BID NOTE <br />THE PROPOSAL WILL INCLUDE ALL NECESSARY LABOR FOR THE RELOCATION OF THE LANDSCAPE ITEMS <br />DESCRIBED HERE TO “RELOCATE” TO LOCATIONS WITHIN THE CITY AND NOTED ABOVE. THE CONTRACTOR <br />SHALL COORDINATE THE RELOCATIONS WITH THE CITY PRIOR TO COMMENCEMENT. <br />THE CONTRACTOR WILL BID ALL ITEMS LISTED HEREIN ON A UNIT COST BASIS AND THAT UNIT COST IS <br />TO INCLUDE THE COST OF ALL LABOR, SOIL AMMENDMENTS, EQUIPMENT COSTS AND PROFIT . ALL PERMITS WILL BE <br />INCLUDED AND PAID FOR BY THE CONTRACTOR. <br />James Santiago <br />Landscape Architect <br />305-791-3156 <br />Total Relocation Project Price