My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PART 3 EXECUTION <br /> <br />3.01 DEMUCKING <br /> <br />A. Muck, organic matter, or other unsuitable material within the limits of the <br />worksite, shall be excavated and removed. <br /> <br />B. Depth of removal shall be that required to reach suitable material. <br /> <br />C. The muck hole shall be dewatered to provide visual inspection by the <br />ENGINEER. <br />D. The muck shall be removed in such a manner as to prevent the unsuitable <br />materials from mixing with suitable material to be used for backfilling. <br /> <br />E. Where muck is encountered at the boundary of the site; sheeting shall be <br />installed and left in place to preclude future damage to the installed fill by <br />adjacent muck. <br /> <br />F. Suitable material shall be placed and compacted where muck or other <br />unsuitable material has been removed and as required to elevate the site to <br />finish grade as specified in this section. <br /> <br />G. Muck and other unsuitable material shall be disposed of at locations secured by <br />the CONTRACTOR and approved by the ENGINEER. <br /> <br />H. Furnish to the ENGINEER, a written release from the OWNER of the property <br />on which the excess material is disposed, stating that the agreements have <br />satisfactorily been fulfilled. <br /> <br />I. Material shall be spread in a manner to drain properly and not disturb existing <br />drainage conditions. <br /> <br />J. Where approved by the ENGINEER muck may be stockpiled and used for top <br />dressing on areas to be grassed. <br /> <br />1. The muck to be used for top dressing shall be free from appreciable <br />quantities of hard clods, stiff clay, hard pan, gravel, brush, large roots, or <br />other deleterious materials, and of reasonably uniform quality. <br /> <br />2. The organic content shall be at least 5 percent and the pH shall be in the <br />range of 5.0 to 7.0. <br /> <br /> <br /> <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02300 - 6 Earthwork <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.