Laserfiche WebLink
a. permit required for the hauling and disposing of this material beyond <br />OWNER's property shall be obtained prior to commencing hauling <br />operations. <br /> <br />b. Provide copies of required permits to the ENGINEER. <br /> <br />3. Suitable excavated material may be used for fill if it meets the Specifications <br />for common fill and is approved by the ENGINEER. <br /> <br />a. Excavated material so approved may be neatly stockpiled at the site <br />where designated by the ENGINEER provided there is an area available <br />where it will not interfere with the operation of the facility nor <br />inconvenience traffic or adjoining property OWNERs. <br /> <br />4. Removal as described in Division 2. <br /> <br />3.07 FIELD QUALITY CONTROL <br /> <br />A. The CONTRACTOR shall retain a certified laboratory and make arrangements <br />for testing necessary to comply with these Specifications, in accordance with <br /> Division 1. <br /> <br />1. One copy of the laboratory test results will be sent to the ENGINEER. <br /> <br />B. Conduct one test per lift for each 300 linear feet of pipeline, or a minimum of two <br />compaction tests per lift for projects with less than 300 linear feet of pipeline, at <br />locations directed by the ENGINEER. <br /> <br /> <br />END OF SECTION <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02319 - 9 Trenching <br />14-1758 / 09-19-2014 <br />