My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.04 QUALITY ASSURANCE <br /> <br />A. The HVS shall be manufactured under the direction of an ISO 9001 Certified Company. <br /> <br />B. Inspection <br />The HVS shall be subject to inspection by the Engineer of Record or the owner’s <br />representative at either the place of manufacture or the project site. Any and all <br />observed defects shall be repaired to the satisfaction of the owner or owner’s <br />representative or replacement shall be made available. <br /> <br /> <br />C. Warranty <br />The manufacturer shall guarantee the HVS from defects in materials and workmanship <br />for a period of two years following installation. If during the warranty period defects in <br />materials or workmanship are noted, then the manufacturer shall be promptly notified. <br />The decision to repair or replace affected units shall be made at the discretion of the <br />manufacturer. <br />D. Patent Indemnity <br />Upon request, the manufacturer shall warrant that the HVS does not infringe upon or <br />violate any patent, copyright, trade secret or any other proprietary right of any third <br />party and shall indemnify the Owner against any loss, cost, expense or liability arising <br />out of such claim whether or not such claim is successful. <br />E. Certificate of Compliance <br />Upon request, the manufacturer shall provide a “Letter of Certification” to certify that <br />the HVS adheres to the specifications required herein and complies with the project’s <br />stormwater management permit. <br /> <br />1.05 MANUFACTURER <br /> <br />A. The HVS shall be supplied by a manufacturer regularly engaged in such work <br />who has furnished similar installations that have been in successful and continuous <br />operation for a minimum period of five years. The manufacturer shall be a <br />Stormwater Equipment Manufacturer Association (SWEMA) member. <br /> <br />B. The HVS shall be certified by an acceptable State agency, such as a State <br />Department of Environmental Protection (DEP) or industry verification or <br />assessment agency (e.g.: ETV, NJCAT, NETE). <br /> <br />PART 2 – STORMWATER HVS <br /> <br />2.01 General <br />A. The HVS shall use a tangential inlet pipe to establish rotational flow within a cylindrical <br />vortex chamber or be able to treat the Water Quality Flow Rate stated herein without re- <br />suspending and releasing captured pollutants. The HVS shall not release captured <br />floating pollutants during surcharge conditions. <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02630 - 7 Storm Drainage <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.