My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the pipe, and the bottom shall be shaped to fit the pipe to a point six inches <br />above the bottom of the pipe. Such bedding material shall be coarse sand, <br />washed limerock or other suitable granular material. Where bell and spigot <br />pipe is used, the bell holes shall be deep enough to ensure that the bell does <br />not bear on the bottom of the excavation, and shall not be excessively wide in <br />the longitudinal direction of the culvert or storm drain. <br /> <br />3.05 COMPACTION <br /> <br />A. When a pipe trench is undercut in order to remove unsuitable material or for <br />other reasons, it shall be brought to required grade using suitable materials, <br />after which the bottom shall be compacted to match approximately the density <br />of the soil in which the trench was cut. <br /> <br />3.06 PIPELAYING <br /> <br />A. As pipe laying progresses, the interior of the pipe shall be cleaned of all dirt and <br />superfluous materials. The CONTRACTOR shall, at all times, take whatever <br />measures are necessary to prevent the entrance of dirt and other foreign <br />matter into the storm sewer system. In the event that it is necessary to clean <br />the pipe before final acceptance, the CONTRACTOR shall do so without <br />additional compensation. <br /> <br />B. Open Trench - No more than 200 linear feet, or the length of trench between <br />consecutive drainage structures, shall be left open behind pipe laying, <br />whichever distance is greater. In no instance shall any trench be left open for <br />more than 24 hours before backfilling in accordance with these specifications. <br /> <br />3.07 DEWATERING <br /> <br />A. The CONTRACTOR shall provide adequate equipment for the removal of <br />storm or subsurface waters that may accumulate in the excavation. If <br />subsurface water is encountered, the CONTRACTOR shall utilize suitable <br />equipment to adequately dewater the excavation so that it will be dry for work <br />and pipelaying. A wellpoint system or other ENGINEER approved dewatering <br />method shall be utilized, if necessary, to maintain the excavation in a dry <br />condition for preparation of the trench bottom and for pipe laying. Dewatering <br />by trench pumping will not be permitted if migration of fine-grained natural <br />material from bottom, sidewalls or bedding material will occur. In the event <br />that satisfactory dewatering cannot be accomplished due to subsurface <br />conditions or where dewatering could damage existing structures, the <br />CONTRACTOR shall obtain the ENGINEER’s approval of wet trench <br />construction procedure before commencing construction. Dewatering shall <br />cease in a manner to allow the subsurface water to slowly return to normal <br />levels. <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02630 - <br />14 <br />Storm Drainage <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.