My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C. Compaction Requirements for Pipe Culverts and Storm Sewers: <br /> <br />1. The backfilling of pipe trenches shall be done in three stages as follows: <br /> <br />a. In the first stage the CONTRACTOR shall provide adequate compacted <br />fill beneath the haunches of the pipe, using mechanical tampers suitable <br />for this purpose. This compaction applies to the material placed <br />beneath the haunches of the pipe. <br /> <br />b. In the second stage the CONTRACTOR shall obtain a well-compacted <br />bed and fill along the sides of the pipe and to a point at lest one foot <br />above the top of the pipe. The width of backfill and compaction to be <br />done under this second stage shall be the width of the portion of the <br />trench having vertical sides, or, when no portion of the trench having <br />vertical sides, it shall be to a width at least equal to twice the outside <br />diameter of the pipe. <br /> <br />c. In the third stage the remainder of the trench shall be backfilled with <br />suitable material, which shall be compacted in accordance with the <br />requirements below. <br /> <br />2. Compaction: <br /> <br />a. The backfill for the first and second stages shall be placed in six-inch <br />layers (compacted thickness) and shall be compacted to 98% of <br />maximum density as determined by AASHTO T180. Where the backfill <br />lies within the roadway embankment or subgrade, it shall be compacted <br />to the densities specified for these areas. <br /> <br />b. When pavement is to be constructed over the pipe, the backfill for the <br />third stage shall be placed in the manner and compacted to the degree <br />required for the first and second stages. Where no pavement is to be <br />constructed and vehicular traffic is not to pass over the pipe, the third <br />stage backfill shall be compacted to a firmness approximately equal to <br />that of the soil adjacent to the pipe trench. <br /> <br />D. Backfill Under Wet Conditions: <br /> <br />1. Where wet conditions are such that dewatering by normal pumping <br />methods would not be effective, the procedure outlined below may be used <br />when specifically authorized by the ENGINEER in writing and noted in the <br />job diary. In such specifically authorized cases the backfill material used <br />below the elevation at which mechanical tampers would be effective shall <br />be of the A-3 soil classification (based on AASHTO Designation M145-49). <br />After the pipe is bedded properly, the A-3 material shall be placed, and <br />rammed and compacted under the pipe haunches by the use of timbers or <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02630 - <br />16 <br />Storm Drainage <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.