My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 EXECUTION <br /> <br />3.01 TEMPORARY PAVING <br /> <br />A. Prior to commencing excavation, the asphalt surface shall be sawcut within the <br />limits of the allowable trench width. <br /> <br />1. Temporary paving will be required along the entire route where the original <br />paved surface is removed. <br /> <br />2. Temporary paving shall be placed the same day the trench is backfilled. <br /> <br />3. The trench shall be backfilled as required in Trenching - Section 02319, up <br />to 1 inch below the existing pavement surface and a temporary, cold mixed <br />sand/asphalt pavement shall be constructed up to the level of the existing <br />pavement surface. <br /> <br />4. The liquid asphalt shall be Grade RC-70 conforming to the requirements of <br />D.O.T. Specifications, Section 916-2. <br /> <br />5. The sand shall conform to the requirements of D.O.T. Specifications, <br />Section 902 for fine aggregate. <br /> <br />B. The cold mix shall be installed one block at a time not crossing intersections to a <br />maximum unpaved ditch length of 1200 feet. <br /> <br />1. When either of these limits are reached, complete the installation of paving <br />prior to continuing with his excavation work. <br /> <br />2. Backfill, compaction and temporary paving is to keep pace with the pipe <br />installation. <br /> <br />3. Written permission must be obtained from the Department and the municipal <br />agency permitting the work to allow greater lengths than 1,200 feet. <br /> <br />4. Permitting agencies may reduce the allowable limits in their permit, or for <br />other unforeseen right-of-way conditions. <br /> <br />C. Prior to completion of the work remove the 1 inch of cold mix and surplus <br />backfill. <br /> <br />1. Replace 1 inch of cold mix and surplus backfill with the specified compacted <br />limerock base course and asphalt within the approved working limits. <br /> <br />2. Municipal agencies permitting this work may accelerate the time for removal <br />of the cold mix, at their discretion. <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02743 - 3 Bituminous Concrete Pavement <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.